On the rules for the protection of linear structures of electric networks and the establishment of their protection zones

Machine translation. This text was translated from Georgian automatically and may contain inaccuracies. Only the Georgian text is legally binding: the original on legali.ge · the official publication on matsne.gov.ge. Translation of the consolidated version of 12.04.2017.

This document in other languages: ქართული (original) · Русский · Türkçe

Type of act
Resolution of the Government of Georgia
Number
№366
Date adopted
24.12.2013

Text of the document

📑 Contents (6 articles)

Government of Georgia

Resolution No. 366

24 December 2013

Tbilisi

On the rules for the protection of linear structures of electric networks and the establishment of their protection zones

Article 1🔗

In accordance with paragraph 6 of Article 3 of the Law of Georgia "On Electric Power and Natural Gas", the attached rules for the protection of linear structures of electric networks and their protection zones shall be approved.

Article 2🔗

The Resolution shall enter into force upon publication. Prime Minister Irakli Gharibashvili

Annex

Rules for the protection of linear structures of electric networks

and their protection zones

Article 1. Purpose of the rules and scope of regulation🔗

1. These rules establish the rules for the protection of linear structures of electric networks, the parameters of their protection zones, of clearings in forest areas and plantations, of access roads to the protection zone, and the conditions for the placement of buildings and structures in protection zones and for the performance of works.

2. The purpose of these rules is to promote the uninterrupted functioning of electric networks, ensure their safe operation, compliance with sanitary norms and the prevention of accidents.

3. These rules apply during the design, construction and operation of electric networks, as well as during the performance of works near power transmission lines.

Article 2. Definition of Terms🔗

1. For the purposes of this Rule, the terms used herein shall have the following meaning:

a) Overhead power transmission line – equipment located in the open air, the purpose of which is the transmission/transfer of electricity (power) via wires fixed to towers or engineering structures with insulators and fittings;

b) Cable power transmission line – insulated wire(s) intended for the transmission/transfer of electricity (power), consisting of one or several parallel branches, with accessories necessary for connection (cable boxes, clamps and other fittings);

c) Substation – a set of electrical equipment (transformers, other electricity converters, distribution devices, synchronous compensators, static capacitors, control devices and other auxiliary means), the purpose of which is the conversion of electricity of one voltage into electricity of another voltage by means of transformers or other electricity converters and the distribution of electricity (power);

d) Distribution point – a set of devices, the purpose of which is the receipt and distribution of electricity (power) at one voltage, without conversion and transformation, and which is not part of a substation;

e) Owner of the electrical network – a natural and/or legal person who operates the electrical network on the basis of a right granted by legislation;

f) Owner of the power transmission line – a natural and/or legal person who operates an overhead and/or cable power transmission line on the basis of a right granted by legislation;

g) Electrical network – a set of substations, distribution devices and their connecting power transmission lines, the purpose of which is the transmission and distribution of electricity;

h) Land user – a person in whose use or ownership there is a land plot and other immovable property located in the protection zone of the linear structures of the electrical network.

2. Construction terms used in this Rule shall be used with the meaning defined by Resolution No. 57 of the Government of Georgia of 24 March 2009 "On the Rules for Issuing Construction Permits and Permit Conditions".

Article 3. Protection zones and clearings of linear structures of electric networks🔗

1. The following shall be established as protection zones of linear structures of electric networks:

a) for overhead power transmission lines:

a.a) the land plot and airspace along an overhead power transmission line, bounded by vertical planes which, on both sides of the line, are spaced from the outermost conductors in an undeflected position by the following distance:

a.a.a)

330, 400, 500 kV

-

30 metres;

a.a.b)

150, 220 kV

-

25 metres;

a.a.c)

110 kV

-

20 metres;

a.a.d)

35 kV

-

15 metres;

a.a.e)

1 – 20 kV

-

10 metres;

a.a.f)

up to 1 kV

-

2 metres;

a.b) along crossings of water bodies (rivers, irrigation canals, lakes, etc.), the water surface and airspace bounded by vertical planes which, on both sides of the power transmission line, are spaced from the outermost conductors in an undeflected position by the following distance:

a.b.a) for navigable water bodies – 100 metres;

a.b.b) for non-navigable water bodies – in accordance with the protection zone established for an overhead power transmission line running over land;

b) for cable power transmission lines:

b.a) the land plot along an underground cable power transmission line, bounded by vertical planes which, on both sides of the line, are spaced from the outermost cables by the following distance:

b.a.a) above 1 kV – 1 metre on each side;

b.a.b) up to 1 kV – 1 metre on each side; if a cable power transmission line runs under the sidewalks of settlements, then – 0.6 metres on the side of buildings and structures and 1 metre on the side of the street roadway;

b.b) along an underwater cable power transmission line, the water space from the water surface to the bottom, bounded by vertical planes which, on both sides of the power transmission line, are spaced 100 metres from the outermost cables;

c) for substations and distribution points:

c.a) from blank walls and fences along the perimeter – 2 metres;

c.b) in the case of a wall with openings, along the perimeter – 4 metres;

c.c) the main access road section – with a width of not less than 3 metres.

2. In the territories of forest massifs, forest parks, gardens and green plantings, the width of clearings for overhead and cable power transmission lines shall be determined:

a) for overhead power transmission lines:

a.a) in forest and plantings up to 4 metres in height – by a distance equal to the distance between the outermost conductors plus three metres on each side. In fruit orchards (green plantings) up to 4 metres in height, making a clearing is not mandatory;

a.b) in forest and plantings more than 4 metres in height:

a.b.a) for all overhead power transmission lines of 330-500 kV voltage, as well as radial 220 kV and lower voltage, which constitute the sole source of electricity supply to consumers – by a distance equal to the distance between the outermost conductors plus the height of the main forest massif on each side; if the height of an individual tree or group of trees standing outside the clearing is greater than the height of the forest massif and there is a danger of their falling onto the conductors of the overhead power transmission line, they shall be cut down;

a.b.b) for all other overhead electric transmission lines of 220 kV and less voltage, the disconnection of which does not cause the termination of electricity supply to consumers — in accordance with subparagraph „a.c“ of paragraph 2 of this article; if the conductors of an electric transmission line passing over slopes and ravines are located 8 metres above the top of a forest massif, the clearing is made on one side — on the lower slope, horizontally two metres from the outermost conductor of the electric transmission line, and on the other side — in accordance with subparagraph „a.c“ of paragraph 2 of this article;

a.c) in reserves, in the greening zone of settlements, in parks, in the windbreak strip along motor roads and railways — at a horizontal distance from the maximally deflected outermost conductors of the overhead electric transmission line to the crowns of trees, which shall be not less than:

a.c.a)

330, 400, 500 kV

-

5 metres;

a.c.b)

150, 220 kV

-

4 metres;

a.c.c)

35, 110 kV

-

3 metres;

a.c.d)

up to 20 kV

-

2 metres;

b) for underground cable electric transmission lines — along the electric transmission line, with a width of not more than 2 metres on both sides.

3. In parks, gardens, forest massifs and protected areas, clearings for electric transmission lines are made by the person owning the electric network, in agreement with the land user, in accordance with the procedure established by legislation.

4. Outside the boundaries of settlements, along the route of underground cable electric transmission lines, poles marking the protection zone of the cable electric transmission line are installed, and on sections posing a high hazard — additionally poles with signs, on which the parameters of the protection zone of the cable electric transmission line and data on the owner of the linear structure of the electric network (name, address, telephone numbers) are indicated.

5. At places where motor roads and overhead electric transmission lines of voltage above 1 kV cross, where the movement of machines/mechanisms is expected whose overall height from the road surface with or without cargo exceeds 4.5 metres, signal signs indicating the permissible height of a moving vehicle shall be installed on both sides of the electric transmission line. The signal signs are installed by the authorised body at the request of the person owning the electric transmission line.

6. On a land plot falling within the protection zone of an electric transmission line, the carrying out of agricultural and other works is permitted in compliance with the requirements established by this procedure and by legislation.

7. The person owning the electric network is entitled, at its own expense, in accordance with the legislation in force, to register the above-ground, underground and underwater linear structures of the electric network with the Registration Service of the Legal Entity of Public Law of the Ministry of Justice of Georgia — the National Agency of Public Registry, indicating their parameters, including the protection zones established by this procedure.

Article 4. Conditions for carrying out works in the protection zones of linear structures of electric networks (overhead and cable power transmission lines)🔗

1. Any action that may cause disruption of the normal functioning of a linear structure of an electric network is prohibited, namely:

a) reconstruction and/or construction of buildings and structures, bridges, collectors, tunnels, motor roads and railways in the protection zone of a power transmission line without carrying out protective measures for the power transmission line or its preliminary relocation. The relocation of the power transmission line shall be carried out at the expense of the interested person, in accordance with the technical conditions established by the owner of the power transmission line;

b) passage of machines and mechanisms under a power transmission line whose total height from the road surface with and/or without cargo exceeds 4.5 metres;

c) arrangement of petrol stations and storage facilities for fuel and lubricating materials in the protection zone of a power transmission line;

d) throwing objects onto wires and towers, touching or tying them, climbing towers, as well as throwing snow and/or other objects from roofs onto wires;

e) liquidation or blocking of access roads to linear structures of electric networks, if there is no alternative access (the access road must be at least 3 metres wide);

f) placement of playgrounds and sports grounds, markets, public transport stops, field tents in the protection zone of a power transmission line, arrangement of standing places for all types of machines and mechanisms and goods, holding of any type of events connected with the gathering of a large number of people, if they do not perform permitted works;

g) presence of unauthorised persons on the territory or in the premises of a linear structure of an electric network, their opening of doors and hatches of buildings and structures, performance of switching on and switching over in the network;

h) carrying out works with impact mechanisms in the protection zone of a cable power transmission line, dropping of cargo weighing more than 5 tonnes, spilling and/or dumping of caustic and corrosive substances, fuel and lubricating materials;

i) arrangement of a jet irrigation system in the protection zone of an overhead power transmission line, as well as arrangement of irrigation by sprinkling;

j) arrangement of any type of landfill in the protection zone of linear structures of electric networks and in its vicinity;

k) arrangement of stacks of chaff, straw and hay, warehouses of peat and firewood in the protection zone of linear structures of electric networks, lighting of a fire for any purpose;

l) launching of kites, flying devices (including uncontrolled) sports models in the protection zone of linear structures of electric networks and in its vicinity.

2. In the protection zone and clearings of linear structures of electric networks, without the written consent of the owner of the power transmission line, the following is prohibited:

a) carrying out of any type of construction, installation, reconstruction and blasting works;

b) carrying out of geological prospecting and exploratory-geological works;

c) planting of plants and trees, arrangement of fences, animal sheds, warehouses for feed and fertilizers, etc.;

d) arrangement of parking areas for motor vehicles and other machines and mechanisms and of driveways, passage of oversized cargo under an overhead power transmission line;

e) arrangement of berths for floating craft, carrying out of works on deepening of the bottom and extraction of soil, loading and unloading of floating craft, dropping of anchors, movement with a dropped anchor, fishing and harvesting of aquatic plants;

f) carrying out of earthworks in the protection zone of underground cable power transmission lines at a depth of more than 0.3 metres, and in arable land — at a depth of more than 0.45 metres, as well as loosening of soil by means of machines and mechanisms.

3. Within one week from the date on which an interested person applies with an application for the purpose of carrying out the works specified in paragraph 2 of this Article, the person owning the electrical network shall be obliged to notify the applicant in writing of consent or of a reasoned refusal.

4. Refusal by the person owning the electrical network to carry out the works provided for by paragraph 2 of this Article may be appealed in accordance with the procedure established by legislation.

5. A person who carries out in the protection zone of a power transmission line any blasting, construction, installation and/or reconstruction, as well as other works, which may cause damage to the power transmission line, shall be obliged to agree with the person owning the said network, for the purpose of protecting the electrical network, the procedure and conditions for the safe carrying out of the works, as well as the date of commencement of the works:

in the case of an electrical network with a voltage higher than 1 kV — 12 days before the commencement of the works;

in the case of an electrical network with a voltage of up to 1 kV — at least 3 days before the commencement of the works.

6. A person who has received written consent to perform works in the protection zone of a linear structure of the electrical network shall be obliged to perform the works in compliance with the conditions (technical) and rules agreed with the owner of the electrical network and to ensure the safety of the electrical network. If earthworks are carried out in the protection zone of a cable power transmission line, for safety purposes the presence of a representative of the person owning the electrical network shall be mandatory during the carrying out of the works.

7. If in the protection zone of a linear structure of the electrical network it is necessary to carry out urgent emergency-recovery works on underground or above-ground engineering communications, the persons owning these communications shall have the right to start carrying out the works without prior agreement, but a representative of the owner of the power transmission line must without fail be summoned to the place of carrying out the works, and the relevant works shall be carried out in his presence. The owner of the linear structure shall be obliged to ensure that his representative arrives before the carrying out of the said works.

8. A person who, in the course of carrying out earthworks, discovers a cable electric transmission line that is not indicated in the technical documentation for the carrying out of earthworks, shall be obliged to suspend the relevant works, ensure the inviolability of the electric transmission line and notify the relevant body of local self-government thereof, which, in turn, shall immediately notify the owner of the cable electric transmission line of the said fact (if his/her identity is known). The relevant decisions shall be taken together with the owner of the electric transmission line.

9. If construction, reconstruction and/or earthworks in the protection zone of an electric transmission line are carried out in violation of these rules, the person owning the linear structure of electric networks shall be entitled to demand the suspension of the works carried out and to notify the relevant body of local self-government and the relevant territorial body of the Ministry of Internal Affairs of Georgia, as well as the relevant body issuing the construction permit, thereof.

10. At the places of intersection of electric transmission lines with motor roads, railways, communication lines, pipelines, navigational means, airports and ports, the rules for the operation of electric transmission lines shall be agreed between the owners of the electric transmission lines and the relevant persons. Emergency-recovery and rehabilitation-preventive works on electric transmission lines may be performed at any time.

11. The design documentation of buildings and structures under construction, on the construction site of which electric transmission lines pass, must include measures for the protection and/or relocation of the electric transmission line in accordance with the technical conditions issued by the person owning the electric transmission lines.

12. The person owning the electric network shall, in the protection zone of electric transmission lines, for the purpose of servicing the electric transmission lines and ensuring safety, have the right to:

a) arrange access roads, bridges and other structures thereto;

b) carry out earthworks (dig trenches, pits, holes);

c) in order to protect the clearing strip, carry out works of cutting trees and branches with their subsequent removal;

d) in the protection zone of motor roads, railways and other communication structures, the performance of the works provided for by subparagraphs „a“ and „b“ of paragraph 12 of this Article shall be permissible by agreement with the persons owning the motor roads, railways and other communication structures;

e) the performance of the works provided for by subparagraphs „a“ and „c“ of paragraph 12 of this Article shall be permissible within the boundaries of the state forest fund, including the protected territories of the state forest fund, with the prior consent of the Ministry of Environment Protection and Natural Resources of Georgia, and on the territory of the local forest fund — with the prior consent of the relevant body of local self-government, in accordance with the procedure established by legislation.

13. The carrying out of emergency-recovery and rehabilitation-preventive works on a power transmission line shall be ensured by the owner of the power transmission line. Engineering-technical personnel shall have the right to move without restriction within the protection zone of the power transmission line, on the access roads thereto and in the clearings, for the purpose of carrying out emergency-recovery and rehabilitation-preventive works on the power transmission line.

14. After the performance of rehabilitation-preventive works, the owner of the power transmission line shall be obliged to restore at its own expense the land and/or road surface and to compensate the damage caused as a result of the performance of these works. 3 days before the performance of the relevant work, the conditions of performance of the work shall be communicated to the land user, the relevant body of local self-government and the relevant territorial body of the Ministry of Internal Affairs of Georgia.

15. In an exceptional case, it shall be permissible to carry out emergency-recovery works on a power transmission line without prior agreement, with the damage to the land and/or road surface and the cutting of plantings necessary for this purpose, with subsequent mandatory notification of the persons (bodies) referred to in paragraph 14 of this Article and compensation of the damage caused.

16. If, in the course of carrying out emergency-recovery works on a power transmission line, it is necessary to remove the road surface and to excavate the ground, before the commencement of the works the representatives of the relevant territorial bodies of the Ministry of Internal Affairs of Georgia, the local self-government bodies and the owners of the road shall be summoned. The place of performance of the works shall be fenced off with warning signs for transport and pedestrians. The works to restore the road surface shall be performed by the owner of the power transmission line.

17. The land user shall be obliged not to obstruct the unimpeded access of the personnel and equipment servicing the linear structures of the electric network.

18. The relevant state and local self-government bodies shall, within the scope of their competence, be obliged to provide assistance to the owner of the electric network in ensuring compliance with the requirements of this rule.

19. The owner of the power transmission line shall conduct explanatory works on the established rule of protection of the power transmission line with the owners of buildings and structures located along the route of the power transmission line.