On Water Resources Management

Machine translation. This text was translated from Georgian automatically and may contain inaccuracies. Only the Georgian text is legally binding: the original on legali.ge · the official publication on matsne.gov.ge. Translation of the consolidated version of 26.06.2025.

This document in other languages: ქართული (original) · Русский · Türkçe

Type of act
Law of Georgia
Number
№3423-XIმს-Xმპ
Date adopted
30.06.2023

Text of the document

📑 Contents (42 articles)

Law of Georgia

On Water Resources Management

Chapter IGeneral Provisions

Article 1. Purpose and Objective of the Law🔗

1. The purpose of this Law is to create legal foundations for water resources management in the country, which ensure the implementation of a unified state policy in the field of the protection of water resources and the use of water resources, the right of citizens to access clean water, the creation of an environment safe for human health and life, and, in accordance with the principles of integrated management, the protection and sustainable use of water resources.

2. The objective of this Law is to create such a system of sustainable integrated management of water resources that:

a) protects the status of the water ecosystem, including water quality, and excludes its further deterioration;

b) protects and improves the condition of water resources and, based on the need for water, the condition of terrestrial and wetland ecosystems directly dependent on water ecosystems;

c) promotes the creation of a flood risk assessment and management system;

d) creates a legal basis for the sustainable use of water resources, taking into account the interests of present and future generations and the principles of sustainable development;

e) promotes the reduction of climate change-induced risk in the field of water resources management;

f) ensures the protection of water resources and the environment and the improvement of their condition, through the gradual reduction and prevention of the entry into and/or discharge into a water body of priority pollutants defined by the legislation of Georgia and, resulting therefrom, of water loss;

g) creates a legal basis for the determination of zones of groundwater that are polluted or at risk of pollution, for the gradual reduction of pollution and protection against further pollution;

h) protects the rights and lawful interests of natural and legal persons in the field of the protection and use of water resources.

Article 2. Subject of Regulation of the Law🔗

This Law establishes the basic principles of the protection of water resources and the use of water resources, and also regulates legal relations:

a) between state authorities and natural and legal persons in the field of the protection of water resources and the use of water resources;

b) the competences of autonomous republics and municipalities in relation to water resources management.

Article 3. Scope of regulation of the Law🔗

1. The scope of regulation of this Law covers surface water and groundwater and their protection zones.

2. Issues related to the use of groundwater shall be regulated by this Law and the Law of Georgia on Subsoil.

3. This Law does not regulate issues related to the maritime space of Georgia (except for the cases defined by this Law for coastal waters). The legal regime of the maritime space of Georgia shall be determined by the Law of Georgia on the Maritime Space of Georgia.

4. The unified regime for the regulation of those rivers, lakes and coastal waters that extend beyond the borders of Georgia (international water resources) shall be determined by international treaties of Georgia. At the same time, within the framework of the said international treaties of Georgia, the management of international water resources shall be carried out on the basis of joint coordinated cooperation of the respective states.

5. This Law shall apply in relation to the parts located on the territory of Georgia of transboundary water basin areas, lakes and coastal waters, unless otherwise provided by an international treaty of Georgia. At the same time, for the purpose of joint management of international water resources in accordance with this Law, the State shall ensure coordinated cooperation with the interested State in accordance with the international treaties ratified by Georgia.

6. When using water resources located in the border zone and border strip of the territory of Georgia, the requirements of the Law of Georgia on the State Border of Georgia and the respective normative acts regulating the protection of the State Border of Georgia shall be observed.

Article 4. Definition of Terms🔗

For the purposes of this Law, the terms used in this Law have the following meaning:

a) water resources – the totality of surface waters (including artificial water bodies) and groundwater;

b) water resources management – regulation, accounting, monitoring and control of the use of water resources;

c) integrated water resources management – a process that promotes the coordinated development and management of water, land and related resources for the purpose of ensuring the equitable growth of economic and social welfare, without causing damage to the sustainability of the ecosystem;

d) surface waters – internal waters (except groundwater), transitional waters, coastal waters, territorial waters and waters of the exclusive economic zone;

e) internal waters – rivers, lakes, glaciers, marshes, permanent snow cover, reservoirs, waters in canals and ponds, as well as groundwater;

f) transitional waters – surface waters near the mouth of a river into the sea that are partially salinised as a result of the influence of coastal waters, but which at the same time are substantially saturated with fresh water;

g) coastal waters – waters extending one nautical mile from the coastline in the direction of the sea;

h) groundwater – water in liquid, solid and gaseous states in the rocks composing the Earth's crust, which is distributed in loose, porous and fissured rocks, as well as in karst cavities;

i) river – a watercourse that flows continuously in a channel formed by it, is fed by surface and underground runoff from a catchment basin, and joins a sea, lake or another river;

j) lake – a natural body of water of standing, slow water exchange of internal surface water contained in a land depression;

k) water use – use of water resources for drinking, domestic, economic and other activities, which is manifested in the abstraction, collection, treatment and/or distribution of surface water or groundwater with or without technical means; as well as the discharge of wastewater into a surface water body;

l) water user – a natural or legal person (regardless of ownership and legal form) that carries out water use in accordance with the procedure established by the legislation of Georgia;

m) river basin – the area delimited by a watershed from which the river system collects runoff waters. A river basin may consist of river sub-basins;

n) river sub-basin – that part of the main river basin from which a tributary river collects surface water and groundwater. Tributary rivers are distinguished hydrographically as first-order (tributary of the main river), second-order (tributary of a first-order river) and a.y. tributaries;

o) river basin district – the totality of the territory and water area consisting of more than one neighbouring river basin and the areas of distribution of groundwater and coastal waters related thereto;

p) territorial unit of river basin/basin district management − a river basin or a basin district of rivers (with the groundwater and coastal waters occurring within and associated with them), which constitutes the main unit of river basin/basin district management;

q) river basin/basin district management plan − an instrument of river basin/basin district management, namely, a plan of measures on which the management of a water object and of the land of a water object located in the territory of a specific river basin/basin district is based in accordance with the main principles of integrated water resources management;

r) surface water object − an independently existing element of surface water, such as a river, lake, marsh, reservoir, stream, canal or part thereof, transitional waters or coastal waters;

s) groundwater object − a complex, horizon or part thereof (aquifer, layer, district) containing a certain/specific volume of groundwater;

t) heavily modified water object − a surface water object which, as a result of human action, has significantly changed its biological, hydromorphological and physico-chemical characteristics;

u) artificial water object − a surface water object created by man;

v) surface water status – the general condition of a surface water object, which is determined on the basis of the worse indicator of the quantitative status, ecological status and chemical status of surface water;

w) groundwater status − the general condition of a groundwater object, which is determined on the basis of the worse indicator of the quantitative status and chemical status of groundwater;

x) ecological status – an expression of the degree of structure and functioning of water ecosystems related to surface waters, which is determined on the basis of biological quality elements and the hydromorphological and physico-chemical quality elements required for these elements;

y) marsh − a part of the landscape characterised by an excessively moist surface and which is characterised by biodiversity;

z) pollution – the direct or indirect release, as a result of human activity, of solid or liquid substances or energy in any form (heat, noise, radioactivity) into atmospheric air, water and soil, which may be harmful to human health, to water ecosystems or to those land ecosystems that depend on water ecosystems, and causes damage to property, or which damages or impedes the state of the environment or the use of the environment for other lawful purposes;

aa) river bed − the lowest part of a river valley in which water flows during the period between floods;

bb) Ministry − the Ministry of Environmental Protection and Agriculture of Georgia;

cc) Minister − the Minister of Environmental Protection and Agriculture of Georgia;

dd) State Water Fund of Georgia − the totality of water contained in all water objects located in Georgia;

ee) Land of the State Water Fund of Georgia (land of a water object) − land occupied by water objects included in the State Water Fund of Georgia (except underground water), hydrotechnical and other water management structures, as well as land allocated as a protection zone of a water object (water protection strip, sanitary protection zone);

ff) environmental flow of a river − the quantity, regime, quality and level of water flow necessary for maintaining freshwater ecosystems and the livelihood and well-being of people dependent on these ecosystems;

gg) water abstraction permit from a surface water object – a special water use permit, by which its holder has the right, for a defined period, using technical means, to abstract a certain quantity of water from a surface water object;

gg¹) water discharge permit into a surface water object − a special water use permit, by which its holder has the right, for a defined period, to carry out the organised discharge of economic-household, industrial, drainage, stormwater and other waters into a surface water object, in compliance with the norms established for the composition of these waters;

gg²) combined water use permit for a surface water object − a special water use permit, by which its holder has the right, for a defined period, to carry out water abstraction from a surface water object and water discharge into a surface water object;

gg³) urban wastewater − household wastewater of a settlement or water mixed from the household wastewater of a settlement with industrial wastewater and/or stormwater runoff;

gg⁴) impact − change of the state of water caused by any human activity;

gg⁵) pollutant − any substance causing pollution; the list of pollutants is determined by the Resolution on surface water quality standards, which is approved by the Government of Georgia;

gg⁶) quantitative status of groundwater − the level of impact caused by direct or indirect water abstraction on a groundwater object;

gg⁷) eutrophication − enrichment of a water object with biogenic elements (nitrogen, phosphorus), which, in turn, causes a reduction of oxygen dissolved in water and, accordingly, has a negative impact on underwater life;

gg⁸) ecological potential − the state (status) of a heavily modified water object and/or an artificial water object;

gg⁹) protected zone − territories existing in each river basin district that require special protection, for the protection of their surface waters and groundwater or habitats directly related to water and water species; including a territory designated for water abstraction for the purpose of supplying the population with drinking water, for the protection of economically important water species, as well as a recreational territory and a territory vulnerable to biogenic substances (nutrients);

gg¹⁰) flood − a prolonged rise of the river water level as a result of snow melting and/or intensive rains to a height that causes flooding of the adjacent territory of the river bed which is not normally covered with water;

gg¹¹) flood risk − the expected consequence of a possible flood within a certain period of time, which may be associated with a threat to human life and health, economic and/or social damage and/or loss;

gg¹²) flash flood − a sudden short-term rise of the river water level to a height that causes flooding of the adjacent territory of the river bed which is not normally covered with water;

gg¹³) agglomeration − a territory where the population and/or economic activity is concentrated for the collection of urban wastewater and its transfer to a treatment plant, or discharge at a final point;

gg¹⁴) sewerage system − the sewerage system provided for by the Law of Georgia “On Energy and Water Supply”;

gg¹⁵) water resources of local importance − natural resources of local importance as defined by the legislation of Georgia;

gg¹⁶) transboundary waters − any surface water and groundwater which mark, cross the borders between two or more States or are located on the borders between two or more States;

gg¹⁷) water supply system − the water supply system provided for by the Law of Georgia “On Energy and Water Supply”;

gg¹⁸) water supply/water supply activity – the water supply activity provided for by the Law of Georgia “On Energy and Water Supply”;

gg¹⁹) use of water resources − consumption of water resources carried out both by abstraction of surface water and groundwater and without abstraction of water;

gg²⁰) environmental decision − an environmental decision provided for by the Environmental Assessment Code;

gg²¹) integrated environmental permit − a permit provided for by the Law of Georgia “On Industrial Emissions”.

Article 5. Basic principles of integrated management of water resources🔗

1. The basic principles of integrated management of water resources are:

a) comprehensive protection and sustainable use of water resources at the national, regional and local levels, on the basis of cooperation with water users;

b) regulation of water resources through the mechanism of river basin management, at the level of river catchment basins.

2. When planning and carrying out activities having an impact on water resources, natural and legal persons, government bodies and other public institutions shall be obliged to be guided by the basic principles of environmental protection established by this Law and the Law of Georgia “On Environmental Protection”.

Chapter IICompetences in the field of protection of water resources and use of water resources

Article 6. Competent bodies in the field of protection of water resources and use of water resources🔗

1. The competent bodies in the field of protection of water resources and use of water resources are:

a) Ministry;

b) Ministry of Internally Displaced Persons from the Occupied Territories, Labour, Health and Social Affairs of Georgia;

c) Ministry of Infrastructure of Georgia;

d) Ministry of Justice of Georgia;

e) Ministry of Economy and Sustainable Development of Georgia;

f) Georgian National Energy and Water Supply Regulatory Commission;

g) Municipality;

h) Bodies of the authorities of the Autonomous Republics of Georgia.

2. The competence of the Ministry includes:

a) development and implementation of the state policy for water resources management;

b) development of proposals for the effective implementation of the state policy for water resources management and their submission to the Government of Georgia;

c) establishment of a river basin management system;

d) issuance of permits for special water use;

e) implementation of unified state control over water protection and use of water resources on the land territory of Georgia, in territorial waters, on the continental shelf and in the exclusive economic zone;

f) organisation of qualitative, quantitative and hydromorphological monitoring of water resources;

g) organisation of state accounting of the use of water resources, analysis of water use reporting data, creation and operation of a database;

h) organisation of a water resources information system and ensuring access to information on water resources;

i) ensuring the development of a river basin/basin district management plan and its submission to the Government of Georgia for approval;

j) ensuring public participation in the process of developing a river basin/basin district management plan;

k) coordination and monitoring of the implementation of the river basin/basin district management plan;

l) organisation of identification, assessment, mapping, forecasting of flood and flash flood hazards and early warning systems;

m) organisation of the preparation/development of recommendations on flood and flash flood mitigation measures;

n) identification of zones polluted by nitrates or at risk of pollution and designation of nitrate-vulnerable zones;

o) identification of sensitive areas and agglomerations at risk of impact from urban waste water;

p) development of surface water quality standards;

q) designation of protected zones on the lands of the State Water Fund of Georgia;

r) development and implementation of state policy in the field of hydro-amelioration;

s) ensuring state control over drinking water quality;

t) ensuring the provision of information to consumers on the qualitative state of drinking water;

u) development of action plans for nitrate-vulnerable zones and implementation of good agricultural practice;

v) Determination of nitrate concentration in surface water and groundwater quality monitoring programmes;

w) Identification of water protection zones and their reflection in the geographic information system;

x) Annual compilation of the water balance;

y) Study of the eutrophication status of fresh surface waters, estuaries and coastal waters within the timeframes and in the manner established by the legislation of Georgia;

z) Other powers provided for by the legislation of Georgia.

3. The competence of the Ministry of Internally Displaced Persons from the Occupied Territories, Labour, Health and Social Protection of Georgia includes:

a) Development of quality standards for drinking water and submission thereof to the Government of Georgia for approval;

b) Submission of a recommendation to the municipalities on the restriction or prohibition of general water use at an individual water body (the said information, in the form of a notice, shall also be sent to the Ministry);

c) Development of the creation of sanitary protection zones for drinking water supply facilities, the establishment of their boundaries, the allocation of belts and the list of activities permitted within them, and the procedure for carrying out activities.

4. The competence of the Ministry of Infrastructure of Georgia includes ensuring the implementation of measures to promote the introduction and development of the water supply system and the sewerage (wastewater) system.

5. The competence of the Ministry of Justice of Georgia includes the registration of the State Water Fund of Georgia in the public land register.

6. Within the scope of its own powers (economic policy, sustainable development, energy, energy efficiency, climate change and renewable energy fields, planning of settlement development and others), the competence of the Ministry of Economy and Sustainable Development of Georgia includes participation in the development and implementation of the state policy for water resources management.

7. The competence of the National Energy and Water Supply Regulatory Commission of Georgia includes the exercise of the respective powers arising from the Law of Georgia "On Energy and Water Supply", the Law of Georgia "On Water User Organisations" and other legislative acts.

8. The competence of the municipality includes:

a) Implementation of measures for water supply and provision with technical water, including:

a.a) Participation in the preparation of technical and investment programmes and projects for water supply systems and for the collection and treatment of urban wastewater;

a.b) Approval of projects for sanitary protection zones of drinking water supply facilities;

b) Familiarisation of the population with the sanitary protection zone of drinking water supply facilities and the boundaries of its belts, as well as with the regimes in force within this zone;

c) Management of water resources of local importance.

9. The competence of the authorities of the Autonomous Republics of Georgia includes participation in the management of water resources located on the territory of the Autonomous Republic in accordance with the procedure established by the legislation of Georgia.

Law of Georgia of 16 April 2025 No. 485 – website, 16.04.2025.

Law of Georgia of 13 May 2025 No. 564 – website, 16.05.2025.

Chapter IIIWater Resources and Their Legal Status, Water Bodies and Their Protection Zones

Article 7. State Water Fund of Georgia🔗

1. The water bodies of Georgia, according to the characteristic of their location on the land surface and in the subsoil, and according to the peculiarities of the formation and use of resources, are divided into surface waters and underground water.

2. Surface waters include the waters of all water bodies listed in paragraph 4 of this Article, except for the underground water provided for by subparagraph “b” of the same paragraph.

3. The totality of water contained in all water bodies of Georgia constitutes the State Water Fund of Georgia.

4. The State Water Fund of Georgia includes:

a) rivers, lakes, reservoirs, other natural and artificial water bodies located on and flowing through the territory of Georgia, as well as the waters of canals and ponds;

b) underground water;

c) glaciers and permanent snow cover;

d) swamps;

e) territorial waters of Georgia;

f) waters of the exclusive economic zone;

g) transitional waters and coastal waters.

Article 8. Right of Ownership over Water Resources🔗

1. Water resources are state property.

2. Water resources of local importance may exist in municipal ownership, the management of which is carried out in accordance with this Law, the Organic Law of Georgia “Local Self-Government Code” and legal acts issued/adopted on their basis.

3. The right of ownership over land does not grant the right to use surface waters existing and/or flowing on that land or underground water, except for use under the common water use procedure provided for by Article 15 of this Law.

Article 9. Identification, Determination of Boundaries and Delimitation of a Water Body🔗

1. A water body constitutes the basic unit of water resources management, the identification and determination of the boundaries of which, as well as the analysis of the characteristics of the river basin/basin area, are carried out by the Ministry.

2. The main characteristics of the identification of a water body are geographical description, hydrological parameters, ecological status, water use.

3. The identification and determination of the boundaries of a water body shall be carried out in accordance with the “Rules for the Identification and Determination of the Boundaries of Water Bodies”, which shall be approved by the Government of Georgia.

Article 10. Land of a Water Body🔗

1. The following shall be considered land of a water body:

a) land occupied by a water body (except underground water), by hydrotechnical and other water management structures;

b) land designated as a protection zone of a water body (water protection strip, sanitary protection zone).

2. The land of a water body shall be used for the construction and operation of those structures (including main pipelines) which ensure the satisfaction of drinking, domestic, medicinal, resort and other necessary needs for water, and for agricultural, industrial, fishery, energy, transport and other necessary needs.

3. The land of a water body may be transferred to natural and legal persons into ownership (except the bottom of a natural lake, the bed of a river, as well as the first belt of the sanitary protection zone of a water supply water body (taking into account the exception defined by the Law of Georgia "On State Property")) and into use, subject to compliance with the restrictions established by the legislation of Georgia.

4. Economic activity on the land of a water body shall be permitted taking into account the restrictions established by the legislation of Georgia.

5. The rules for the use of the land of a water body shall be determined by this Law and other legislative and subordinate normative acts of Georgia.

Article 11. Protection Zone of a Water Body🔗

1. The protection zone of a water body (water protection zone) shall include:

a) water protection strip – a territory adjacent to a water body and for which a special regime of use of this territory for domestic purposes, use of natural resources and carrying out other economic activity is established. The water protection strip shall include, among others, the coastal strips of a river, lake, reservoir and the Black Sea, and the strips of alienation of main canals and other canals;

b) sanitary protection zone – a territory located around a drinking water intake, medicinal mineral water, underground or surface source (drinking water supply facilities) and for which a special regime of use of this territory for domestic purposes, use of natural resources and carrying out other economic (including resort-balneological) activity is established.

2. The rules for establishing the boundary of the water protection strip of a water body, including the list of activities permitted in this strip, the conditions and regime for carrying out the activity, shall be determined by the technical regulation "On the Water Protection Strip", which shall be approved by the Government of Georgia.

3. The Ministry of Internally Displaced Persons from the Occupied Territories, Labour, Health and Social Affairs of Georgia shall develop, and the Government of Georgia shall approve, the creation of the sanitary protection zone of drinking water supply facilities, the establishment of boundaries, the allocation of belts and the list of activities permitted within them and the rules for carrying out the activity.

Chapter IVWater Use

Article 12. Object of water use and types of water use🔗

1. The object of water use is the water bodies defined by this Law.

2. Water use includes:

a) general water use;

b) special water use.

Article 13. General conditions of water use🔗

During water use, the following conditions shall be observed:

a) For drinking and domestic water supply of the population, surface water and/or groundwater reliably protected from pollution and littering shall be used, the quality of which in its natural state or after appropriate treatment complies with the norms established by the legislation of Georgia;

b) Industrial, agricultural and other enterprises which generate wastewater containing polluting substances and which are subject to the permit regime for water discharge into a surface water body provided for by this Law, in order to protect water bodies and water catchment basins from pollution, shall be equipped with wastewater treatment facilities (devices) corresponding to the specifics of the enterprise;

c) A natural and/or legal person, when transporting goods, shall protect water supply sources located on the goods transportation route from pollution and depletion, and water management structures and devices from damage;

d) A water user shall, when a representative of the relevant authorized body exercises functions defined by the legislation of Georgia, taking into account safety norms and the requirements of existing technical regulations, allow him/her unhindered access to his/her territory and immediately upon request provide him/her with all necessary information and documentation;

e) In cases of particularly low water availability, emergency situation at a water body, threat of outbreak of epidemic and/or epizootic, natural disaster, military operations and/or other extreme cases or other cases provided for by the legislation of Georgia, the rights of water users may be restricted for the purpose of protecting the life and/or health of the population, as well as due to the interests of other water users;

f) A natural and/or legal person shall, for the purpose of preventing pollution of surface water and groundwater, carry out soil moistening and fertilization on agricultural land in compliance with permissible norms for irrigation and nutrients to be introduced into the soil; also, for the purpose of preventing the development of eutrophication in a surface water body, not allow the entry of organic substances and erosion of soils of agricultural land.

Article 14. Supply of the population with water intended for drinking and domestic purposes🔗

1. Water resources shall be granted for use primarily to satisfy the drinking and/or domestic needs of the population. Within the framework of the population's right of access to water, the supply of the population with safe water continuously, in sufficient quantity and at an affordable price shall be ensured.

2. Priorities of water use for other purposes shall be determined by river basin/basin district management plans.

3. For the purpose of informing the public, the Ministry shall develop a mechanism for providing information to the public and shall publish once every 3 years a report on the state of water intended for human consumption. The content of the report on the state of water intended for human consumption shall be determined by order of the Minister.

4. The quality of water intended for human consumption shall be determined by the technical regulation "On the Quality of Water Intended for Human Consumption", which shall be approved by the Government of Georgia.

Article 15. General water use🔗

1. General water use, with surface water and/or groundwater, shall be carried out:

a) for non-commercial purposes, including to satisfy personal (drinking, domestic, recreational, health-improving and other similar) needs, without the use of such a structure and/or device that has a significant impact on the state of the water body from which water abstraction is planned and/or on the water protection zone;

b) for the purpose of fire extinguishing and conducting emergency-rescue works.

2. General water use shall be carried out without a special water use permit, in compliance with the requirements established by the legislation of Georgia.

3. General water use shall be free of charge.

4. General water use may be restricted for the purposes of protecting the life and/or health of the population.

5. In the presence of circumstances posing a threat to the life and/or health of the population, municipalities, on the basis of this Law, within the scope of delegated authority, in accordance with the legislation of Georgia:

a) in coordination with the Ministry and the Ministry of Internally Displaced Persons from the Occupied Territories, Labour, Health and Social Protection of Georgia, shall determine the places where bathing is prohibited;

b) in coordination with the Ministry and the Ministry of Internally Displaced Persons from the Occupied Territories, Labour, Health and Social Protection of Georgia, shall determine the places where it is prohibited to take water for drinking and/or domestic needs, for watering livestock and/or for fishing.

6. The municipality shall be obliged, immediately upon the establishment of the prohibitions provided for by paragraph 5 of this Article, to publish, or otherwise (dissemination in the form of an information notice, distribution of information leaflets to citizens, placement of an information sign at the relevant water body, and otherwise) make accessible to the population information on the possibility of general water use and the conditions of its restriction.

Article 16. Special water use on a surface water body🔗

1. Special water use on a surface water body is water use through the use of such a structure and/or device that has a significant impact on the condition of the water body from which water abstraction is planned. The following shall be considered a significant impact on the condition of a water body:

a) water abstraction from a surface water body in an amount of more than 15 m³ per day (except for the case provided for by subparagraph „b“ of paragraph 1 of Article 15 of this Law);

b) discharge into a surface water body of wastewater containing polluting substances in any amount.

2. Special water use on a surface water body shall, in accordance with this Law, be carried out on the basis of the following special water use permits:

a) water abstraction permit from a surface water body;

b) water discharge permit into a surface water body;

c) combined permit for water use on a surface water body.

3. The combined permit for water use on a surface water body grants its holder the right to carry out the activities defined by subparagraphs „a“ and „b“ of paragraph 2 of this Article.

4. In accordance with the Environmental Assessment Code, a person carrying out an activity subject to environmental impact assessment shall acquire the right of special water use on the basis of an environmental decision, without obtaining the water use permit defined by paragraph 2 of this Article. In particular, if a person carrying out an activity subject to environmental impact assessment needs special water use provided for by this Law, it shall be obliged, in order to obtain the right of special water use, together with the application for obtaining an environmental decision, to submit to the authorised body the documentation provided for by Article 17 of this Law. The term and conditions of special water use by a person carrying out an activity subject to environmental impact assessment shall be determined in accordance with Article 20 of this Law and by the environmental decision provided for by the Environmental Assessment Code. At the same time, after the expiry of the water use term determined by the environmental decision, the person carrying out the activity shall be obliged to obtain a special water use permit in the manner established by this Law.

5. The obligation to obtain special water use permits defined by this Law shall also apply to a person holding an environmental decision who, after the issuance of the relevant environmental decision for the activity, has the conditions of water abstraction and/or water discharge changed and/or needs water abstraction from a surface water body in such a way that no change in the operating condition occurs.

6. If, after the issuance of an environmental decision for the activity, the conditions of water abstraction and/or water discharge change for the person carrying out the activity, and/or that person requires water abstraction from a surface water body, which results in a change of the operating condition, the person carrying out the activity shall, within the framework of the screening procedure for the activity defined by Article 7 of the Environmental Assessment Code, or, in the case of the application of paragraph 12¹ of Article 5 of the Environmental Assessment Code, submit to the authorised body, together with the application on the change of the operating condition provided for by Article 7¹ of the same Code, the documentation required for obtaining the special water use permit defined by Article 17 of this Law.

7. A person carrying out an activity subject to an integrated environmental permit in accordance with the Law of Georgia "On Industrial Emissions" shall acquire the right of special water use on the basis of the integrated environmental permit, without obtaining the water use permit defined by paragraph 2 of this Article. Namely, if a person carrying out an activity subject to an integrated environmental permit, as defined by the Law of Georgia "On Industrial Emissions", needs special water use provided for by this Law, that person shall, in order to obtain the right of water use, submit to the authorised body an application for obtaining an integrated environmental permit, in which it reflects the information provided for by Article 17 of this Law. The term and conditions of water use by a person carrying out an activity subject to an integrated environmental permit shall be determined in accordance with Article 20 of this Law and by the integrated environmental permit. At the same time, after the expiry of the term of water use determined by the integrated environmental permit, the person carrying out the activity shall obtain a special water use permit in accordance with the procedure established by this Law.

8. The obligation to obtain special water use permits defined by this Law shall also apply to a person holding an integrated environmental permit whose conditions of water abstraction and/or water discharge change after the issuance of the integrated environmental permit for the activity, and/or who requires water abstraction from a surface water body, and, at the same time, the said change, in accordance with the Law of Georgia "On Industrial Emissions", does not constitute a change of the production technology of the activity and/or of the operating conditions.

9. If, after the issuance of an integrated environmental permit, the conditions of water abstraction and/or water discharge change and/or water abstraction from a surface water body is required, which entails a change in the production technology of the activity and/or the operating conditions, the person carrying out the activity shall be obliged to reflect in the application on the planned change defined by the Law of Georgia on Industrial Emissions the information provided for by Article 17 of this Law. At the same time, the term and conditions of water use shall be determined in accordance with Article 20 of this Law and by the relevant decision.

Law of Georgia of 26 June 2025 No. 797 – website, 04.07.2025.

Article 17. Rule and conditions for issuing a special water use permit🔗

1. A special water use permit for a surface water body shall be issued in accordance with Chapter VII of the Law of Georgia “On Licences and Permits” and Chapter VI of the General Administrative Code of Georgia, except for the cases provided for by this Law.

2. A special water use permit for a surface water body shall be issued by:

a) the Ministry;

b) the municipality (for water resources of local importance).

3. The application to be submitted for obtaining a water abstraction permit from a surface water body shall, in addition to the documents provided for by the Law of Georgia “On Licences and Permits”, be accompanied by:

a) a brief technical (technological) description of the activity;

b) water use parameters;

c) a schematic plan of the water use system (if any);

d) a situational plan of the location, indicating the coordinates of the water abstraction points and the outline of watercourses (a flow of water running along the slope of the terrain in natural or artificial beds (river, stream, gully, ravine, canal));

e) hydrological and qualitative (physical-chemical and biological) description of the water body intended for water use.

4. In order to obtain a permit for the discharge of water into a surface water body, in addition to the documents provided for by the Law of Georgia “On Licences and Permits”, a draft of the norms of maximum permissible discharge of pollutants discharged into a surface water body together with waste water (hereinafter – MPD norms) shall be submitted, which shall include:

a) hydrological and qualitative (hydrochemical and hydrobiological) description of the water body intended for water use;

b) brief information on the water user (capacity of the enterprise, description of technological processes, raw materials used and products manufactured, operating regime, and a.y.);

c) description of water use at the enterprise, description of waste water sources indicating the GPS coordinates of the discharge point (in the UTM WGS 1984 coordinate system), their quantitative and qualitative characteristics;

d) capacity of treatment facilities and treatment parameters;

e) calculation of MPD norms;

f) measures necessary to prevent emergency discharge of waste water;

g) control over compliance with MPD norms (methods of recording water use and discharge, control parameters of waste water quality and frequency of sampling);

h) a plan of measures necessary for compliance with MPD norms.

5. In order to obtain a combined permit for water use of a surface water body, in addition to the documents provided for by the Law of Georgia “On Licences and Permits”, the information provided for by paragraphs 3 and 4 of this Article shall be submitted.

6. The municipality shall issue a combined water use permit for a surface water body only if both water abstraction and water discharge relate to a water resource of local importance (except for activities subject to environmental impact assessment and activities subject to an integrated environmental permit). In other cases, the Ministry shall issue the combined water use permit for a surface water body.

7. A special water use permit shall be issued within 45 calendar days. When transferring water resources for use, taking into account the priority of satisfying the population's drinking and/or domestic needs, when issuing the permit the Ministry shall verify whether the municipality plans water abstraction from the surface water body indicated in the application of the person interested in water use for the purpose of satisfying the population's drinking and/or domestic needs, and if such exists, shall take that circumstance into account when making the decision.

8. A special water use permit for a surface water body shall be issued taking into account the relevant river basin/basin district management plan and the river environmental flow, in accordance with the methodology for assessing the environmental flow of rivers, which is approved by order of the Minister.

9. In the border zone and border strip defined by the Law of Georgia "On the State Border of Georgia" and the relevant normative acts, a special water use permit for a surface water body shall be issued in agreement with the relevant authorized body of the Ministry of Internal Affairs of Georgia.

10. The rules and conditions for issuing special water use permits shall be determined by the Resolution of the Government of Georgia "On approval of the rules and conditions for issuing special water use permits for surface water bodies".

Article 18. Grounds for refusal to issue a special water use permit🔗

A special water use permit for a surface water body shall not be issued if:

a) the requirements of the Law of Georgia "On Licences and Permits" and/or other legislative and subordinate normative acts of Georgia are violated;

b) the information submitted for obtaining the water use permit does not correspond to reality;

c) the person interested in discharging wastewater containing polluting substances into a surface water body does not have the appropriate equipment (wastewater treatment facility, installation) that ensures the prevention of pollution, contamination of water or other negative impact on it;

d) the issuance of the permit contradicts the requirements established by the legislation of Georgia.

Article 19. Appealing refusal to issue a special water use permit🔗

The decision of the body issuing a special water use permit on refusal to issue a permit may be appealed to a higher administrative body (official) or to a court.

Article 20. Term of Validity of a Special Water Use Permit🔗

1. Special water use permits for a surface water body shall be issued for a term of not more than 5 years, except for the exceptions provided for by paragraph 2 of this Article.

2. A special water use permit for a surface water body, taking into account the management plan of the respective river basin/basin district, shall be issued:

a) for water use of irrigation systems − for a term of not more than 25 years;

b) for drinking water supply to the population − for a term of not more than 30 years;

c) for water use of a hydroelectric power plant and a thermal power plant − for a term of not more than 49 years (according to the term provided for by the respective contract concluded with the State).

3. The issuer of a water use permit shall be entitled, on the basis of an analysis of data of State monitoring of not less than the last 10 years, in the event of a significant change in the quantitative indicators of water caused by natural conditions against the background of climate change, to review the issued water use permit and to make an amendment thereto.

Chapter VWater Resources Management System

Article 21. Water Resources Management System🔗

1. The water resources management system combines the mechanisms of protection and use planning and management of water resources at the national level and at the river basin/basin district level.

2. Water resources management shall be carried out in accordance with the principles of basin management.

Article 22. Determination of a River Basin/Basin District🔗

1. A river basin/basin district shall be determined by a Resolution of the Government of Georgia "On Approval of the Boundaries of River Basins/Basin Districts".

2. The determination of a river basin/basin district shall be carried out in compliance with the following rules:

a) any surface water body, groundwater and coastal waters must belong to a specific river basin or basin district;

b) it is possible for a river basin, together with another river basin, to be determined as one basin district and to be named after the names of the main rivers of these river basins;

c) groundwater occurring within a river basin belongs to the said basin;

d) if the location of groundwater does not exactly coincide with the location of a river basin, it must be identified and associated with the nearest or most suitable basin;

e) coastal waters shall be assigned to the basin nearest to them.

Article 23. Mechanism for Planning and Management of Water Resources🔗

1. The basis for the planning and management of water resources at the river basin/basin district level is the river basin/basin district management plan.

2. The river basin/basin district management plan shall be approved by the Government of Georgia upon submission by the Ministry.

3. The river basin/basin district management plan shall be approved for a term of 6 years and shall be updated once every 6 years.

4. The procedure for the development, consideration and approval of the river basin/basin district management plan shall be established by the Government of Georgia.

Article 24. Development of a River Basin/Sub-basin District Management Plan🔗

1. The Ministry shall organise the development of the draft river basin/sub-basin district management plan and its public discussion.

2. The river basin/sub-basin district management plan shall provide for:

a) an analysis of the characteristics of the sub-basin territorial unit of the integrated management of the river basin/sub-basin district (including a description based on the results of the study of the characteristics, which for surface waters includes the boundaries of water bodies, the typology of surface waters, reference conditions, and for groundwater − the location and boundaries of groundwater);

b) a description of significant anthropogenic pressures and impacts on the status of surface water and groundwater bodies (including an assessment of pollution from point sources, an assessment of pollution from diffuse sources − including a brief description of the land use scheme), an assessment of pressure on the quantitative status of water − including an assessment of water abstraction, an analysis of other impacts of human activity on water status;

c) a list of zones at risk of negative impact on water and a risk management programme;

d) a map showing the boundaries of protected zones;

e) a map of the monitoring network developed for the purpose of determining ecological status, which shall also reflect the results of the monitoring programmes on the basis of which the status was determined;

f) a list of environmental objectives established for surface water and groundwater bodies, as well as for water bodies located in protected zones, including information covering cases of allowing exceptions to the establishment of environmental objectives and the relevant information related thereto;

g) a brief overview of the economic analysis of water use (including identification of the most cost-effective measures related to water consumption that should be included in the programme of measures, and others);

h) an overview of the programme of measures established for the purpose of achieving the environmental objectives;

i) a list and brief description of other programmes and management plans developed within the territorial unit of the river basin/sub-basin district management that have or may have an impact on water bodies located in the sub-basin territorial unit;

j) information on the public discussions and consultations held at the stage of development of the river basin/sub-basin district management plan and on the reflection of their results in the plan;

k) information on the river basin/sub-basin district management body and its local representation, as well as information on the contact person and the procedure for requesting the basic documents and these documents.

3. A programme of actions/measures for the implementation of the river basin/sub-basin district management plan constitutes a constituent part of the river basin/sub-basin district management plan, which shall determine the organisational, financial and material and technical aspects of the implementation of the plan. Methodologies for the development of individual elements of the river basin/sub-basin district management plan shall be approved by order of the Minister.

Article 25. Public participation in the process of preparing the river basin/basin district management plan🔗

1. The process of preparing the river basin/basin district management plan shall be public. The public shall have the right, in accordance with the procedure established by the legislation of Georgia, to participate in that process.

2. After the preparation of the draft river basin/basin district management plan, the draft plan shall be considered by the relevant basin management consultative-coordinating council established on a territorial basis, in accordance with the rules defined by the Resolutions of the Government of Georgia "On the Procedure for the Preparation, Consideration and Approval of Basin Management Plans" and "On the Rules for the Establishment and Operation of Basin Management Consultative-Coordinating Councils".

3. The basin management consultative-coordinating councils are advisory bodies under the Ministry, the purpose of which is to ensure cooperation between state agencies and private entities for the protection and sustainable use of water resources existing in the territory of the relevant basin district.

4. The composition of the basin management consultative-coordinating council shall include employees of the Ministry and of other competent bodies provided for by Article 6 of this Law (including their local territorial bodies), representatives of the relevant municipalities, as well as representatives of organisations carrying out activities in the territory of the relevant river basin district (companies carrying out water supply activities, hydropower generation companies and a.y.) that have a significant impact on the state of water resources, large water users, water users' associations (if any) and representatives of other interested organisations.

5. The composition of the basin management consultative-coordinating councils shall be approved by the Minister.

6. The Ministry shall ensure the publication, in relation to the river basin/basin district, of the information defined by paragraph 7 of this Article, and its accessibility to the public for the purpose of receiving opinions.

7. The Ministry shall:

a) in accordance with paragraph 6 of this Article, publish the following information:

a.a) the schedule and work programme necessary for the preparation and updating of the river basin/basin district management plan, indicating the issues on which public discussion will be held;

a.b) the procedure for public discussion of the draft river basin/basin district management plan and the draft river basin/basin district management plan;

b) ensure:

b.a) the accessibility (upon request) of the main documents and information used in the preparation of the draft river basin/basin district management plan;

b.b) the organisation of public discussion of the draft river basin/basin district management plan.

8. After the draft river basin/basin district management plan has been considered by the basin management consultative-coordinating council, the Ministry shall ensure that a strategic environmental assessment is carried out for the draft plan, in accordance with Chapter III (Strategic Environmental Assessment) of the Environmental Assessment Code.

9. The requirements of this Article shall also apply to an updated river basin/basin district management plan. The updated plan shall also include a brief overview of the measures that were defined by the previous plan but were not implemented, as well as a brief description of the amendments and additions, an assessment of progress towards the achievement of the environmental objectives, including the monitoring results for the period of the previous plan (in the form of a map), and an explanation of the cases where the achievement of the environmental objectives envisaged by the plan was not possible.

Article 26. Classification of Water Bodies🔗

1. Classification of water bodies is carried out according to their ecological status.

2. In the process of classification of a surface water body, the quantitative, biological, hydromorphological and physico-chemical indicators of water shall be taken into account, and in the case of a groundwater body – geological-hydrological, quantitative and physico-chemical and qualitative indicators of water. These indicators determine the status of surface water and groundwater.

3. Differentiation of an artificial water body and a heavily modified surface water body is carried out on the basis of the characteristics of the surface water most closely approximating them.

4. Based on ecological status (which is determined by the biological, hydromorphological and physico-chemical indicators of the water body), a surface water body is classified into bodies with the following status:

a) high;

b) good;

c) satisfactory (medium);

d) poor;

e) very poor.

5. Based on chemical status, a surface water body is classified into bodies with the following status:

a) good;

b) poor.

6. Based on groundwater status, a groundwater body is classified into bodies with the following status:

a) groundwater body with good quantitative status;

b) groundwater body with poor quantitative status;

c) groundwater body with good chemical status;

d) groundwater body with poor chemical status.

7. A heavily modified water body and/or an artificial water body is classified according to ecological potential as follows:

a) with high ecological potential;

b) with good ecological potential;

c) with satisfactory ecological potential;

d) with poor ecological potential;

e) with very poor ecological potential.

8. The criteria for classification of water bodies are determined by the "Methodology for Classification of the Ecological Status and Ecological Potential of Water Bodies", which is approved by the Minister.

9. For all types of surface water bodies, typical background hydromorphological, physico-chemical and biological conditions are determined, which correspond to high ecological status, or, in the case of a heavily modified water body and/or an artificial water body – to the corresponding indicators of water bodies of the same type with high ecological potential, which constitutes the basis for establishing the water quality standard. The review of background indicators of surface water with high ecological potential is carried out every 6 years.

10. The surface water quality standard is the maximum concentration of a specific pollutant and/or group of pollutants in water or sediment, the exceedance of which is not permitted from the standpoint of human health and environmental protection.

11. Surface water quality standards are determined by Resolution of the Government of Georgia "On Approval of Surface Water Quality Standards".

Article 27. Target indicators of the qualitative state of surface water and groundwater🔗

1. For each surface water body characterised by moderate, poor or very poor water status, target indicators of water status shall be established, except in cases where the water body is subject to strong anthropogenic impact, or its natural condition is such that it is impossible to achieve good water status, or requires incurring inadequate costs. In such a case, it is permissible to set less stringent environmental objectives and to implement measures to prevent further deterioration of water status.

2. For each surface water body, the target indicator is its "good water status", including "good ecological status" and "good chemical status", while for a heavily modified water body and/or an artificial water body — "good ecological potential" and "good chemical status".

3. For each groundwater body characterised by poor quantitative and qualitative water status, target indicators of water status shall be established.

4. For each groundwater body, the target indicator is its good quantitative and chemical status.

Article 28. Programmes of measures for the preservation and improvement of water quality🔗

1. The programme of measures for the preservation and improvement of water quality includes:

a) measures for the consistent reduction of pollution and the cessation of the discharge of pollutants into surface waters;

b) measures for the achievement of target indicators by the water body;

c) measures for the preservation of the water status of high-status surface waters and of heavily modified water bodies or artificial water bodies with high ecological potential;

d) in the case of achievement of the target indicator, measures for the preservation of water status and, in certain cases, for its further improvement up to high ecological status;

e) special measures to prevent any significant and sustained upward trend in groundwater pollution caused by human activity;

f) measures for the preservation of good quantitative and chemical status of groundwater;

g) measures for the implementation of existing water protection requirements;

h) measures for the efficient use of water;

i) measures for the protection of drinking water quality;

j) measures for the control of point and diffuse sources of pollution;

k) other measures aimed at preventing and eliminating significant impact.

2. Where several possible target indicators exist for a specific water body, measures for the achievement of the priority target indicator among them shall be planned.

Chapter VIProtection and restoration of water resources

Article 29. Basic requirements for the protection of water resources🔗

For the purpose of protecting water resources and protecting them from negative impact, the following shall be prohibited:

a) Discharge of polluting substances together with wastewater into surface water and groundwater bodies, if the conditions established by the permit for discharge into a surface water body are not complied with. Any direct discharge of polluting substances into groundwater;

b) Placement and/or burial of waste in a water body and its protection zone;

c) Filling of a reservoir until the measures provided for preparing its bed have been implemented;

d) Abstraction of surface water and groundwater, if this may cause the water level to drop below the permissible level and/or the water body to dry up (abstraction of groundwater, if this may cause disruption of the balance of the groundwater body);

e) Abstraction of water from a river, construction/operation of hydraulic engineering and production facilities, arrangement/operation of irrigation systems and water abstraction for other purposes without taking into account the environmental flow of the river;

f) Littering and/or pollution of water by losses of oil, timber, chemical products, petroleum, mineral and organic fertilizers, toxic chemicals and other products from water transport, pipelines, floating and other structures located on a water body;

g) Timber rafting;

h) Such activity as may damage a water intake structure, worsen water quality and/or reduce the water yield;

i) Water use without taking into account sanitary protection zones.

Article 30. Requirements relating to urban wastewater treatment🔗

1. The norms for the discharge of urban wastewater into a surface water body and the criteria for determining sensitive areas at risk of impact from urban wastewater shall be established by the technical regulation "Conditions for the Discharge of Urban and Industrial Wastewater into Surface Water Bodies", which shall be approved by the Government of Georgia.

2. The quality of industrial wastewater entering the urban wastewater sewerage (sewage) system and the treatment facility shall at minimum meet such conditions and be in such a state that:

a) it does not pose a threat to the health of the personnel servicing the said systems and treatment facilities;

b) it does not cause damage to the said system, treatment facility and relevant equipment;

c) it ensures the uninterrupted operation of the wastewater treatment facility, compliance with the technological regime of treatment and the neutralization of sludge;

d) it ensures compliance with the conditions for the discharge of urban wastewater and the prevention of negative impact on the environment.

3. In the event that the conditions provided for by paragraph 2 of this Article are not met, appropriate pre-treatment of industrial wastewater is necessary.

4. The technical conditions for discharge into the urban wastewater sewerage (sewage) system shall be determined by the technical regulation "Conditions for the Discharge and Acceptance of Wastewater into the Sewerage (Sewage) System and Maximum Permissible Norms of Pollutants", which shall be approved by the Government of Georgia.

Chapter VIIControl of the Protection and Use of Water Resources

Article 31. Bodies authorised to exercise control in the field of protection and use of water resources and the scope of control🔗

1. Control in the field of protection and use of water resources, within the scope of their competence, shall be exercised by:

a) the state sub-agency institution of the Ministry − Environmental Supervision Department (hereinafter − the Department);

b) a Legal Entity of Public Law subordinated to state control of the Ministry − National Food Agency (hereinafter − the National Food Agency);

c) (deleted − 13.05.2025, No. 564);

d) a Legal Entity of Public Law within the system of the Ministry of Economy and Sustainable Development of Georgia – State Agency for Oil and Gas (hereinafter − the State Agency for Oil and Gas);

e) the municipality.

2. The Department shall exercise:

a) control over the fulfilment of the conditions of combined permits for water abstraction from a surface water body, discharge of water into a surface water body and water use through a surface water body;

b) within the scope of its competence, the prevention, detection and suppression of facts of unlawful use of water resources;

c) the prevention, detection and suppression of facts of pollution and/or littering of water resources;

d) state control in the field of use of groundwater.

3. The National Food Agency shall exercise state control over the quality of drinking water and provide information to consumers on the qualitative state of drinking water.

4. (deleted − 13.05.2025, No. 564);

5. The State Agency for Oil and Gas shall carry out the disposal of water separated from hydrocarbon-containing fluid and control.

6. The municipality shall exercise control over the use of water resources of local importance.

Law of Georgia of 13 May 2025 No. 564 – website, 16.05.2025.

Chapter VIIIState System of Monitoring of Water Resources and Accounting of Water Use

Article 32. State monitoring system of water resources🔗

1. The state monitoring system of water resources constitutes a unified system of regular observation and data analysis of the hydrological, hydromorphological, hydrogeological, chemical and ecological state of surface water and groundwater objects and of the quantitative and qualitative characteristics of water, the purpose of which is to obtain information on the state of water objects, their interaction with the environment (natural and anthropogenic), the natural and anthropogenic processes occurring in a river basin, and hazardous and catastrophic events, and the analysis, assessment and forecasting of risk factors.

2. The state monitoring system of water resources includes a unified national monitoring network, through which hydrological, hydrochemical, hydrobiological, hydromorphological and hydrogeological monitoring programmes are implemented.

3. State monitoring of water shall be carried out by a Legal Entity of Public Law within the system of the Ministry — the National Environment Agency (hereinafter — the National Environment Agency), which, at the request of interested parties, ensures the provision of quantitative and qualitative observation data to them. The National Environment Agency regularly disseminates hydrological forecasts and warnings on expected natural events; it also regularly provides the public and interested parties with information on the degree of pollution of water objects.

4. The water state monitoring plan shall be developed annually by the National Environment Agency and approved by the Minister.

5. The rules for planning and implementing water resources monitoring shall be determined by a Resolution of the Government of Georgia.

Article 33. State accounting system of water use🔗

1. State accounting of water use shall apply to the water use of entrepreneurial natural and legal persons, if one or both of the following conditions exist:

a) in the course of this water use, more than 1 m³ of water per day is abstracted from a water object;

b) in the course of this water use, discharge of wastewater into a water object is carried out.

2. State accounting of water use shall be maintained by the Ministry.

3. State accounting of water use shall be carried out in electronic form.

4. The rules and conditions for maintaining state accounting of water use shall be established by the "Rules for Maintaining State Accounting of Water Use", which shall be approved by the Minister.

5. Accounting shall also apply to boreholes for the extraction of underground fresh drinking water in accordance with the technical regulation — the "Rules for Accounting of Boreholes for the Purpose of Extracting Underground Fresh Drinking Water", which shall be approved by the Government of Georgia.

Chapter IXFlood risk management

Article 34. Flood risk management🔗

1. The National Environmental Agency shall, once every 6 years, carry out a preliminary flood risk assessment for all river basin districts and identify areas where a potential significant flood risk exists.

2. The National Environmental Agency shall prepare flood hazard maps, while the state sub-agency institution within the governance sphere of the Ministry of Internal Affairs of Georgia − Emergency Management Service (hereinafter − Emergency Management Service) − shall prepare flood risk maps for all areas identified as areas of potential significant flood risk. These maps shall define zones with medium probability of flooding (at least one event in 100 years), and low and high probability cases. In those zones of river basins that are designated as flood risk zones, the number of the population potentially at risk and the potential risk of damage to economic activity and the environment shall also be indicated.

3. The flood risk management plan shall be prepared in accordance with the procedure established by the legislation of Georgia. The flood risk management plan shall provide for flood prevention, protection against it and preparedness issues, including flood forecasting and early warning systems. Flood risk management plans shall be reflected in the river basin/river basin district management plan.

4. In agreement with the Emergency Management Service, competent state agencies shall develop flood risk management plans. Flood risk management plans shall be approved in accordance with the procedure established by the legislation of Georgia.

5. The functions and competences of state agencies in the matter of preparedness for flood-related emergencies, response, prevention and carrying out early-stage recovery works shall be determined by the legislation of Georgia.

6. The Government of Georgia shall issue a Resolution "On the Assessment of Areas at Risk of Potential Floods".

Chapter XEconomic mechanisms of water resources management

Article 35. Economic mechanisms for the sustainable use and protection of water🔗

1. The economic mechanisms for the sustainable use and protection of water are based on the principle of "paid nature use" defined by the Law of Georgia "On Environmental Protection".

2. For the implementation of the principle of "paid nature use", the environmental and water resource use costs related to water use shall be taken into account, in accordance with the requirement of paragraph 3 of this Article, when establishing the fee for the use of natural resources.

3. In the case of water abstraction from a surface water body in the form of special water use, the water user shall pay a fee for the use of natural resources, the amount and payment procedure of which are determined by the Law of Georgia "On Fees for the Use of Natural Resources".

4. The amount of the fee provided for by paragraph 3 of this Article shall ensure the efficient use and sustainable management of water resources and, accordingly, the implementation of environmental objectives.

5. The obligation to pay the fee for the use of natural resources provided for by paragraph 3 of this Article shall also apply to persons carrying out activities subject to environmental impact assessment who hold an environmental decision and/or an integrated environmental permit.

Chapter XIResponsibility for violation of water legislation

Article 36. Responsibility for violation of the law🔗

1. Responsibility for violation of this Law shall be determined by the legislation of Georgia.

2. The imposition of the responsibility provided for by paragraph 1 of this Article on the offender does not release the offender from the environmental responsibility established by the legislation of Georgia. Natural and legal persons shall be obliged to compensate for the damage caused to the environment by violation of this Law, in accordance with the legislation of Georgia on environmental responsibility.

Chapter XIITransitional provisions

Article 37. Normative Acts to Be Adopted (Issued) and Measures to Be Implemented in Connection with This Law🔗

1. By 1 September 2026, the Government of Georgia shall ensure the adoption of the following legal acts:

a) “Rules for the Identification of Water Bodies and Determination of Their Boundaries”;

b) “On Approval of the Boundaries of River Basins/Basin Districts”;

c) Technical Regulation “On the Quality of Water Intended for Human Consumption”;

d) “On the Procedure for the Development, Review and Approval of River Basin Management Plans”;

e) “Rules for Planning and Implementing Water Resource Monitoring”;

f) “On the Assessment of Areas at Risk of Potential Floods”;

g) Technical Regulation “On the Water Protection Zone”;

h) “On Approval of the Rules for Establishing Sanitary Protection Zones of Drinking Water Supply Facilities and for Carrying Out Activities within Them”;

i) “On Approval of Surface Water Quality Standards”;

j) Technical Regulation “Conditions for the Discharge of Urban and Industrial Wastewater into Surface Water Bodies”;

k) Technical Regulation “Conditions for the Discharge and Reception of Wastewater into the Sewerage (Sewage) System and Maximum Permissible Norms for Pollutants”;

l) “On Approval of the Rules and Conditions for Issuing Special Water Use Permits for Surface Water Bodies”;

m) Technical Regulation − “Rules for the Registration of Boreholes for the Extraction of Fresh Underground Drinking Water”;

n) “On the Rules for the Establishment and Operation of River Basin Management Consultative-Coordinating Councils”.

2. By 1 September 2026, the Minister shall ensure:

a) issuance of an Order “On the Content of the Report on the Status of Water Intended for Human Consumption”;

b) approval of the relevant methodologies regulating the field of water resource management;

c) identification of zones polluted by nitrates or at risk of pollution in surface waters and determination of zones vulnerable to nitrates;

d) determination of rules of good agricultural practice for zones vulnerable to nitrates and development of relevant action plans;

e) approval of the “Rules for Maintaining State Records of Water Use”;

f) identification of zones polluted by nitrates or at risk of pollution in groundwater and determination of zones vulnerable to nitrates;

g) identification of sensitive areas and agglomerations at risk of impact from urban wastewater.

3. By 1 September 2027, the Ministry of Infrastructure of Georgia shall ensure:

a) description of the sewerage (sewage) systems of cities and villages;

b) development of comprehensive measures to improve the condition of the sewerage (sewage) systems of cities and villages, in order to protect water resources from pollution by sewage wastewater.

4. From 1 January 2026, the Ministry and the agencies within its system shall ensure the implementation of the appropriate measures provided for by the legislation of Georgia for the creation of structural subdivisions necessary for the uninterrupted performance of the functions assigned to them by this Law and/or for the announcement of relevant competitions for appointment to vacant positions of civil servants.

5. Legal acts adopted/issued on the basis of the Law of Georgia “On Water” of 16 October 1997 (Parliamentary Gazette, No 44, 11.11.1997, p. 123) retain legal force until they are declared invalid or until the adoption/issuance of the relevant legal acts on the basis of this Law, if they do not contradict the requirements of this Law.

Law of Georgia of 16 April 2025 No 485 – website, 16.04.2025.

Article 38. Transitional provisions related to the obtaining of a special water use permit by persons holding an environmental decision🔗

1. A person to whom an environmental decision was issued before the entry into force of the permit regime for special water use provided for by this Law shall carry out special water use in accordance with the conditions established by the environmental decision. At the same time, in the case where the conditions of water abstraction and/or water discharge change and/or water abstraction from a surface water body is required in such a way that no change of the operating condition occurs, the person carrying out the activity shall obtain a special water use permit in accordance with the procedure established by this Law. In the case of a change of the operating condition, this change shall be carried out in accordance with the procedure established by Article 7¹ of the Environmental Assessment Code.

2. If the conditions of water abstraction and/or water discharge change for the person carrying out the activity and/or such person requires water abstraction from a surface water body, which causes a change of the operating condition, the person carrying out the activity shall, within the framework of the screening procedure for the activity defined by Article 7 of the Environmental Assessment Code or, in the case of the application of paragraph 12¹ of Article 5 of the Environmental Assessment Code, submit to the authorised body, together with the application on the change of the operating condition provided for by Article 7¹ of the same Code, the documentation necessary for obtaining the special water use permit defined by Article 17 of this Law. The term and conditions of water use shall be determined by Article 20 of this Law and the relevant decision.

Law of Georgia of 26 June 2025 No 797 – website, 04.07.2025.

Article 39. Transitional provision related to the agreed technical conditions for water abstraction from a surface water body and to a person carrying out water discharge into a surface water body🔗

1. A person who, on the basis of the Resolution of the Government of Georgia “On Approval of Environmental Technical Regulations”, has agreed technical conditions for water abstraction from a surface water body and carries out water use in accordance with the procedure established by the agreed technical conditions, shall not require the special water use permit provided for by this Law until the expiry of the term of the agreement on the technical conditions for water abstraction from a surface water body.

2. In the event of a change to the agreed technical conditions for water abstraction from a surface water body, the person carrying out the activity shall obtain a special water use permit, in accordance with the procedure established by this Law.

3. A person whose activity is not subject to environmental impact assessment and who carries out the discharge of wastewater containing pollutants into a surface water body shall be obliged to obtain the relevant special water use permit by 1 September 2027.

Article 40. Transitional provision related to the obtaining of a permit for water discharge into a surface water body by entities servicing amelioration drainage systems and centralised sewerage (sewage) systems🔗

1. The need for the arrangement of structures and/or technical means for water discharge into surface water bodies by amelioration drainage systems shall be determined by the body/persons authorised for that purpose, by a conclusion prepared on the basis of the results of laboratory analyses submitted by the owner of the amelioration drainage system.

2. The operation of subparagraph “b” of paragraph 2 of Article 16 of this Law (permit for water discharge into a surface water body) shall extend to existing centralised sewerage (sewage) systems from 1 January 2028.

Chapter XIIIFinal Provisions

Article 41. Normative act declared invalid🔗

The Law of Georgia “On Water” of 16 October 1997 shall be declared invalid (Parliament Gazette, No. 44, 11.11.1997, p. 123).

Article 42. Entry into force of the Law🔗

1. This Law, except for Articles 1–36, paragraph 5 of Article 37 and Articles 38–41 of this Law, shall enter into force upon publication.

2. Articles 1–5 of this Law, paragraph 1 of Article 6, subparagraphs "a"–"w", "y" and "z" of paragraph 2, paragraphs 3–7, subparagraphs "a" and "b" of paragraph 8 and paragraph 9, Article 7, paragraphs 1 and 3 of Article 8, Articles 9–16, paragraph 1 of Article 17, subparagraph "a" of paragraph 2, paragraphs 3–5 and 7–10, Articles 18–30, subparagraphs "a"–"d" of paragraph 1 of Article 31 and paragraphs 2–5, Articles 32–34, paragraphs 1, 2 and 4 of Article 35, Article 36, paragraph 5 of Article 37 and Articles 38–41 shall enter into force from 1 September 2026.

3. Subparagraph "x" of paragraph 2 of Article 6 and paragraphs 3 and 5 of Article 35 of this Law shall enter into force from 1 September 2027.

4. Subparagraph "c" of paragraph 8 of Article 6, paragraph 2 of Article 8, subparagraph "b" of paragraph 2 and paragraph 6 of Article 17, subparagraph "e" of paragraph 1 and paragraph 6 of Article 31 of this Law shall enter into force from 1 January 2030.

President of Georgia Salome Zourabichvili

Tbilisi,

30 June 2023

N3423-XIms-Xmp