On Approval of the “Rules of the Electricity (Capacity) Market”

Machine translation. This text was translated from Georgian automatically and may contain inaccuracies. Only the Georgian text is legally binding: the original on legali.ge · the official publication on matsne.gov.ge. Translation of the consolidated version of 11.03.2026.

This document in other languages: ქართული (original) · Русский · Türkçe

Type of act
Order of the Minister of Georgia
Number
№77
Date adopted
30.08.2006

Text of the document

📑 Contents (38 articles)

State Registration Code 300.300.000.22.025.009.162

Minister of Energy of Georgia

Order No. 77

30 August 2006

Tbilisi

On Approval of the Rules of the Electricity (Capacity) Market

Pursuant to subparagraph b of paragraph 6 of Article 3 of the Law of Georgia No. 3292-Is of 9 June 2006 on Amendments and Additions to the Law of Georgia “On Electricity and Natural Gas” and subparagraph c of paragraph 3 of Article 3 of the Law of Georgia “On Electricity and Natural Gas”, I order:

1. The Rules of the Electricity (Capacity) Market shall be approved.

2. The Order shall enter into force from 1 September 2006.

Acting Minister A. Khetaguri

Rules of the Electricity (Capacity) Market

Chapter IGeneral Provisions

Article 1. Scope of Application🔗

These Rules regulate:

a) the functioning of the Electricity (Capacity) Market and the activity of the System Commercial Operator;

b) commercial, financial and technical relations arising through direct contracts and/or the System Commercial Operator in connection with the purchase and sale, transmission, distribution, dispatch of electricity, the operation of electric power systems in parallel mode, and the consumption for own needs of electricity generated by a licensee for electricity generation;

c) the rules for drawing up electricity (capacity) balances and their fulfilment;

d) the conditions for the conclusion and entry into force of direct contracts; determines the categories of electricity sellers for the purpose of establishing different conditions for the sale of electricity by them.

Article 2. Definitions of terms🔗

1. The terms used in these Rules have the same meaning as in the Law of Georgia on Electricity and Natural Gas.

2. Other terms used in these Rules have the following meaning:

a) “electricity metering” – the process of electricity metering, which includes all types of measurement by means of a metering device;

b) “transit” – the transit of electricity through a network belonging to a distribution or generation licensee, a small capacity power plant or a direct consumer, to another qualified enterprise and/or to a retail consumer who purchases electricity from a small capacity power plant;

c) “own means of electricity generation” – a power plant whose generated electricity is used for the purpose of supplying electricity to a facility that, together with this power plant, is in the direct ownership of the same natural or legal person;

d) “direct contract for the purchase and sale of electricity transmission, dispatch and transit services” – in accordance with these Rules, a bilateral contract between, on the one hand, the electricity transmission, dispatch, and distribution licensee, a small capacity power plant and a direct consumer and, on the other hand, a qualified enterprise, for the provision of transmission, dispatch and transit services, which is registered by the dispatch licensee and provides for the terms of electricity transmission and/or dispatch and/or transit services;

e) “own consumption of a power plant” – the economic expenditure necessary for ensuring the technological process of electricity (capacity) generation and for the operation of the plant;

f) “total plant expenditure of electricity” – the own consumption of the power plant, as well as electricity losses arising in the plant's power and measuring instruments, transformers and power transmission lines;

g) “own consumption of a substation” – the economic expenditure necessary for ensuring the technological process and operation of the substation;

h) “electricity expenditure in the electricity transmission network” – electricity expenditure which includes the own consumption of the substation, as well as losses in electricity transmission lines, power, step-up and measuring transformers, compensation coils, shunt reactors, synchronous compensators and capacitor banks;

i) “electricity expenditure in the electricity distribution network” – electricity expenditure which includes the own consumption of the substation, as well as losses in the electricity distribution, overhead and cable network, power and measuring transformers, current-limiting reactors, compensation coils, synchronous compensators and capacitor banks;

j) “above-norm electricity loss” – the positive difference between the actual loss existing in the transmission network and the normative electricity loss (technological expenditure) established by the Commission;

k) "Electricity wholesale metering system" – a system created by a combination of measuring transformers, connecting wires, meters, collecting, converting and transmitting devices for metering the quantity of electricity, its parameters and recording them for a certain period.

l) "Balancing electricity price" – the price of balancing electricity sold by the system commercial operator, which is calculated in accordance with Chapter 4 of these Rules;

m) "Wholesale trade" – the purchase and sale of electricity, including balancing electricity, capacity and reserve capacity, between enterprises authorized under the Law of Georgia "On Electricity and Natural Gas" and these Rules;

n) "Reporting period" – one calendar month;

o) "Commercial operator of the electricity system" – the system commercial operator;

p) "Electricity (capacity) producer" – a generation licensee and a small capacity power plant.

Chapter IIWholesale trade in electricity (capacity)

Article 3. Grant of the Right to Participate in Wholesale Trade in Electricity to a Qualified Enterprise by the Commercial Operator of the System🔗

1. A participant in wholesale trade in electricity (capacity) may become a licensee for generation and distribution, a direct consumer, a small capacity power plant, an importer and an exporter that meets the requirements of the Law of Georgia “On Electricity and Natural Gas” and of these Rules, as well as the Commercial Operator of the System.

2. Every person that meets the requirements established by the Law of Georgia “On Electricity and Natural Gas” and by these Rules for a qualified enterprise shall, in connection with the grant of the right to participate in wholesale trade in electricity (capacity), apply to the Commercial Operator with a corresponding application.

3. For registration with the Commercial Operator, a qualified enterprise shall submit the following documentation:

a) an application in the established form addressed to the Commercial Operator of the System, in connection with obtaining the right to participate in wholesale trade in electricity;

b) a licence issued by the Commission (for the respective licensee);

c) an extract from the Entrepreneurial Register concerning the authorized person (persons);

d) a document confirming the registration of the person, and for a legal entity also the charter;

e) technical conditions for connection to the electric network issued by the person owning the respective network (if any);

f) a schematic description of the connection and metering points.

g) a forecast indicator of annual consumption or generation or transmission or distribution of electricity, including a forecast capacity schedule showing maximum and minimum loads.

4. A qualified enterprise shall, within 10 days, notify the Commercial Operator and submit the corresponding documentation on changes made in the data provided for by paragraph 3.

5. Copies of the documents submitted by a qualified enterprise shall be certified by the respective authorized person.

6. The Commercial Operator of the System shall decide the issue of granting or refusing to grant a qualified enterprise the right to participate in wholesale trade in electricity within a period of no later than one week from receipt of the application.

7. The Commercial Operator of the System is entitled not to satisfy a qualified enterprise’s application for the grant of the right to participate in wholesale trade in electricity if it does not meet the requirements of the Law of Georgia “On Electricity and Natural Gas” and of these Rules.

8. The decision of the Commercial Operator of the System on granting or refusing to grant the right to participate in wholesale trade in electricity shall be communicated to the applicant no later than one week from receipt of the application.

9. A qualified enterprise and a licensee for transmission and electricity dispatch shall be obliged to:

a) in order to ensure the reliable functioning of the electric power system, install, assemble, repair, keep in readiness and operate the means at its disposal;

b) bring the main means to the operational level within optimal timeframes;

c) provide the commercial operator with the requested information for the full exercise of its functions.

10. A qualified enterprise and a transmission licensee shall subordinate the means at their disposal to the requirements of the dispatch licensee. Subject to compliance with this condition, the qualified enterprise independently determines the expediency and degree of loading of a given means; the qualified enterprise may withdraw its means from central dispatching (the system) only if such action is permitted by a regime pre-established by the dispatch licensee.

Article 4. Termination by the system's commercial operator of the right of a qualified enterprise to participate in wholesale trade in electricity🔗

1. The grounds for termination of the right of a qualified enterprise to participate in wholesale trade in electricity are:

a) revocation of the licence by the Commission;

b) a decision of the appropriate body on the liquidation of the qualified enterprise;

c) a change in the circumstances that became the basis for granting the qualified enterprise the right to participate in wholesale trade in electricity.

2. The decision on termination of the right of a qualified enterprise to participate in wholesale trade in electricity shall be taken independently by the system's commercial operator. The decision of the system's commercial operator on termination of the right of a qualified enterprise to participate in wholesale trade in electricity (capacity) constitutes the ground for termination of the supply of electricity to the qualified enterprise.

Article 5. Export and Import of Electricity🔗

1. Any person that has a respective direct contract for the import and/or export of electricity registered with the dispatch licensee in accordance with the established procedure may carry out export and import.

2. The registration of direct contracts concluded for export and import shall be subject to the requirement and procedure established in Chapter 3 of these Rules for the registration of direct contracts.

3. If there are import and export applications in the appropriate direction and if the transmission network capacity cannot ensure the satisfaction of all applications, the owner of the transmission network shall announce an auction for the acquisition of the right to network capacity.

4. The winner of the auction for the acquisition of the right to network capacity shall be determined by the highest price criterion.

5. The notice on the holding of the auction shall be published in the mass media and on the website of the respective transmission licensee 14 calendar days before the expiry of the deadline for the receipt of applications for the holding of the auction.

6. The specific conditions for participation in the auction and the procedure for holding the auction shall be established by the respective transmission licensee. The costs related to the holding of the auction shall be borne by the participating entities in the form of advance contributions.

7. Information on the results of the auction and the winning persons shall be immediately communicated to the auction participants and published in the mass media and on the website of the respective transmission licensee within no later than 3 working days after the holding of the auction.

Article 6. Powers of Electricity Exporters and Importers🔗

1. An electricity importer shall be entitled to sell the imported electricity through direct contracts to a qualified enterprise and/or through the system commercial operator.

2. An electricity exporter shall be entitled to purchase the electricity intended for export through direct contracts from qualified enterprises and/or through the system commercial operator.

3. Metering of imported or export-designated electricity shall be carried out by means of metering instruments installed on devices located at the points of receipt and delivery on the territory of Georgia.

4. Metering of imported and exported electricity shall be carried out in accordance with these Rules.

Article 7. Electricity Distribution Activity and Direct Consumer🔗

1. For the electricity distribution activity, the respective person shall sell no less than 120 million kWh of electricity to retail consumers per year (from September to August inclusive).

2. A direct consumer shall consume no less than 30 million kWh of electricity per year (from September to August inclusive) for its own needs.

Chapter IIIDirect Contracts

Article 8. Parties to a direct contract🔗

The conclusion of a direct contract on the purchase and sale of electricity (capacity), including balancing electricity (capacity), is possible between qualified enterprises which, in accordance with the Law of Georgia "On Electricity and Natural Gas" and these Rules, have been granted the right to participate in wholesale trade in electricity (capacity).

Article 9. Mandatory Registration of a Direct Contract with the Dispatch Licensee🔗

1. A direct contract shall be submitted for registration to the dispatch licensee no later than 5 calendar days before the commencement of the contract's operation.

2. For registration, it is necessary to submit the following documents:

a) a registration application in accordance with the approved form;

b) two originals of the direct contract, signed and certified on all pages and annexes by the respective authorized persons of both parties;

c) documents confirming the provision of reserve capacity by distribution licensees and direct consumers in accordance with Chapter 6 of these Rules;

d) in the case of supply and/or receipt of electricity (capacity) through the network owned by the distribution licensee, a contract concluded with the distribution licensee for electricity (capacity) wheeling services.

3. A direct contract shall enter into force after registration with the dispatch licensee.

4. The electricity dispatch licensee is entitled to refuse registration of a direct contract if:

a) any party to the direct contract is not a qualified enterprise;

b) the deadlines for submitting the direct contract for registration have been violated;

c) the requirements of paragraph 2 of this Article have been violated;

d) the direct contract contradicts the requirements of normative acts adopted by the Ministry and/or the Commission;

e) the dispatch of electricity (capacity) provided for by the direct contract is impossible and/or the implementation of this direct contract may hinder the operational-dispatch management of the system;

f) the direct contract does not specify the exact time of commencement and completion of its operation and the indicative volumes;

g) the relevant qualified enterprise has not registered the relevant direct contract for the purchase of electricity transmission, dispatch and/or wheeling services.

5. The parties to a direct contract shall, 5 days before the commencement of each reporting period, provide the dispatch licensee with hourly forecast schedules of consumption and supply for the upcoming reporting period under the contract. The parties shall notify the dispatch licensee of changes in these schedules no less than two days in advance.

6. If the electricity dispatch licensee does not send to both parties, within 5 calendar days from the submission of the contract, a notification of refusal to register the contract, the contract shall be considered registered.

7. Any amendments to a direct contract shall require the same procedures for registration as the registration of the direct contract.

Article 10. Termination of Direct Contract🔗

1. An application on early termination of a direct contract shall be submitted for registration to the dispatch licensee no later than 15 days before termination.

2. Registration of the termination of a direct contract by the dispatch licensee shall result in termination of the operation of the direct contract.

3. The electricity dispatch licensee shall refuse an application on termination of a direct contract if:

a) the conditions specified in this Article for submission of an application on termination of a direct contract for registration are violated;

b) the direct contract does not provide for its unilateral termination, if the application is submitted by only one party, except when the termination of the direct contract is caused by a material violation of its terms by the other party to the direct contract.

Article 11. Confidentiality of Information🔗

The electricity dispatch licensee and the system commercial operator shall not disclose the prices given in a direct contract (except for regulated and marginal tariffs), except in cases when the law provides for the provision of this information to third parties.

Chapter IVTrade in Balancing Electricity

Article 12. Trade in balancing electricity through the system commercial operator🔗

1. For the purpose of buying and selling balancing electricity through the system commercial operator, direct contracts shall be concluded between the commercial operator and qualified enterprises.

2. In accordance with a direct contract concluded pursuant to paragraph 1 and registered with the dispatch licensee, qualified enterprises shall send to the commercial operator applications completed in the established form for participation in trade in balancing electricity. An application for the purchase and sale of balancing electricity shall be submitted no later than 3 calendar days before the supply of balancing electricity.

3. In the event of technical impossibility of executing an application for the purchase of balancing electricity, the electricity dispatch licensee shall be entitled not to include this volume of electricity in the electricity (capacity) supply-consumption plan, of which it shall be obliged to immediately notify the commercial operator, with the relevant justification.

4. After agreement with the dispatch licensee, the system commercial operator shall select the received applications for the purpose of admission to trade in balancing electricity in the following manner:

a) the commercial operator shall consider applications for sale in ascending order of the prices submitted in the applications, and in the case of equal prices, in accordance with the sequence of their submission;

b) the commercial operator shall consider applications for purchase in accordance with the sequence of their submission.

5. On the basis of the selected applications, the system commercial operator shall draw up a list of buyers and sellers and the corresponding schedule (volumes) for the supply and consumption of balancing electricity, of which it shall notify the trade participants.

6. Under the concluded transactions, sellers shall have the obligation to supply, in accordance with the established schedules, the corresponding volumes of the sold electricity, and buyers shall have the obligation to consume, in accordance with the established schedules, the volumes of the purchased electricity.

7. Within 12 days after the end of the reporting period, the system commercial operator shall send to the trade participants notifications on the conducted trades, concluded transactions, the price of balancing electricity, and the volumes of sold/purchased electricity.

8. Electricity offered for sale at trades shall be free from any other contractual obligations, including bilateral fixed-term contractual obligations.

9. The System Commercial Operator is entitled to require qualified enterprises to submit a bank guarantee to secure the performance of obligations arising from transactions, where the payment of the fee for the electricity (capacity) purchased by such qualified enterprise through the commercial operator in the previous month is delayed by more than 5 days. The amount of such bank guarantee shall be determined by the value of the electricity purchased by such qualified enterprise through the System Commercial Operator in the previous month.

Article 13. Direct contract with standard terms🔗

1. The System Commercial Operator shall register, with the dispatch licensee, direct contracts drawn up with standard terms for the purchase and sale of balancing electricity. The requirements of Chapter 3 shall not apply to the registration and modification of these contracts.

2. The direct contracts referred to in paragraph 1 shall be used for the purchase and sale of those volumes of balancing electricity for which qualified enterprises did not have registered direct contracts within the time limits established by these Rules for the respective reporting period.

3. A qualified enterprise that supplies or consumes the electricity for which no direct contract is registered shall be deemed a party to the direct contract referred to in paragraph 1.

4. The commercial operator may terminate the validity of the direct contracts referred to in the first article with a specific qualified enterprise in accordance with Article 12 of these Rules.

Article 14. Formation of the price of balancing electricity🔗

1. The System Commercial Operator shall effect settlements with sellers of balancing electricity at the prices indicated by them in the application during the reporting period.

2. In the absence of a proper application, the System Commercial Operator shall effect settlements with sellers of balancing electricity in accordance with Article 24.

3. The System Commercial Operator shall effect settlements with buyers of balancing electricity at the weighted average price of the electricity received from the sellers (including with and without an application) during the reporting period.

4. If, in accordance with these Rules, the volume requested by an application made by an electricity buyer for the purchase of balancing electricity was not fully or partially consumed during the reporting period, the buyer shall pay the commercial operator, for the unutilized volume, the penalty provided for by the terms of the contract. The amount of the penalty shall be directly proportional to the unutilized volume of balancing electricity.

5. The sale of balancing electricity by qualified enterprises shall be carried out at the same tariff at which it was purchased, and where there are several sources of purchase – at the average weighted tariff.

6. All other responsibilities and obligations between the commercial operator and qualified enterprises in respect of the purchase and sale of balancing electricity shall be determined by bilateral contracts.

Chapter VSystem Commercial Operator

Article 15. Functions of the System Commercial Operator🔗

1. The System Commercial Operator carries out the activity defined by the Law of Georgia on Electricity and Natural Gas. Its functions and scope of authority are determined by the legislation of Georgia, its charter and these Rules.

2. The functions of the System Commercial Operator are:

a) purchase and sale of balancing electricity (capacity) (including by way of concluding medium- and long-term contracts for import and export). For this purpose, the System Commercial Operator carries out:

a.a) conclusion of direct contracts with qualified enterprises for trading in balancing electricity and registration of direct contracts drawn up in the form of standard terms with the dispatch licensee;

a.b) determination of the volume of balancing electricity by comparing the actual quantities specified in contracts and recorded in acceptance-transfer acts of generated, supplied and consumed electricity;

a.c) calculation of the price of balancing electricity in accordance with these Rules;

a.d) settlement with qualified enterprises for balancing electricity purchased and sold by the System Commercial Operator.

b) provision of the electric power system with reserve capacity in accordance with the Law of Georgia on Electricity and Natural Gas and these Rules. Including but not limited to:

b.a) identification of the cheapest and most efficient reserve capacities in the system and provision of relevant information to the dispatch licensee;

b.b) conclusion of direct contracts for the purchase of reserve capacity with relevant qualified enterprises;

b.c) monitoring of the use of reserve capacity;

b.d) settlement with qualified enterprises for reserve capacity purchased and sold by the System Commercial Operator.

c) creation and maintenance of a unified database on wholesale purchase and sale, including a unified accounting register. Including but not limited to:

c.a) creation and maintenance of a unified database of accounting points;

c.b) creation of a unified database of meter readings according to reporting periods;

c.c) collection and systematization of all necessary information on electricity generation facilities, substations, and consumers.

d) determination, based on information received pursuant to the Law of Georgia on Electricity and Natural Gas, of electricity sellers, buyers, and the quantities of electricity sold and purchased by them, and submission of settlement documentation.

e) prior agreement and monitoring of performance of direct contracts on parallel operation concluded by the electricity dispatch licensee with relevant enterprises of electric power systems neighboring Georgia.

f) inspection of meters used in wholesale accounting.

Article 16. Remuneration for the services of the system commercial operator🔗

1. Remuneration for the services of the system commercial operator is mandatory for all qualified enterprises at the tariff established by the Commission.

2. For producers and importers, payment of the tariff for the services of the system commercial operator shall be made according to the full volumes of electricity supplied to the salte, and for distribution licensees, exporters and direct consumers – according to the full volumes of electricity consumed.

3. Qualified enterprises shall be obliged to remunerate the cost of the services of the system commercial operator no later than the 25th day of each month.

4. Upon the demand of the system commercial operator, qualified enterprises shall be obliged to submit the guarantees provided for by law for covering the cost of the services of the system commercial operator and/or make advance payment.

5. The system commercial operator is entitled to apply, in respect of qualified enterprises that have failed to pay the cost of services or that have violated payment deadlines, the measures conferred by law, including payment of the penalty stipulated by the bilateral contract for each day of delay.

6. Failure by qualified enterprises to pay the cost of services or systematic violation of the payment deadline constitutes grounds for terminating or restricting the supply of electricity to them, a decision on which shall be taken by the system commercial operator.

7. Termination of a qualified enterprise's authority to participate in wholesale trade does not release it from payment of the cost of the commercial operator's services and the accrued penalty.

8. The price at which the system commercial operator sells reserve capacity and balancing electricity shall not include the profit component of the system commercial operator. This component must be provided for in the tariff for the services of the system commercial operator.

Chapter VIReserve capacity

Article 17. Formation of Reserve Capacity🔗

1. Electricity distribution licensees and direct customers, for the purpose of ensuring their demand, shall be obliged to have reserve capacity of the required volume in accordance with the Law of Georgia "On Electricity and Natural Gas" and these Rules.

2. Responsibility for ensuring the sold reserve capacity shall be borne by the seller of reserve capacity and shall be regulated by a direct contract for the purchase of the corresponding reserve capacity.

3. Upon the instruction of the dispatch licensee, electricity distribution licensees, direct customers, as well as the commercial operator (in cases where the purchase of reserve is carried out through the system commercial operator) shall carry out the purchase of capacity reserve according to the following types:

a) primary regulation reserve (load reserve) – capacity reserve that ensures primary regulation of the electric power system within a period of not more than 50-60 seconds and ensures the operation of the system for not less than 15 minutes;

b) secondary regulation reserve – capacity reserve that ensures secondary regulation of the electric power system and replacement of primary regulation with a mobilization time of not more than 15 minutes and by maintaining the load for not less than 1 hour;

c) cold reserve – capacity reserve that ensures replacement of secondary regulation of the electric power system with a mobilization time of not more than 6 hours.

Article 18. Registration of a direct contract for the purchase of reserve capacity with the dispatch licensee🔗

1. A direct contract for the purchase of reserve capacity shall be submitted for registration to the dispatch licensee.

2. In case of a change in the forecast consumption indicators of the relevant qualified enterprises, they shall adjust the existing reserve capacity purchase contracts and/or submit new contracts for the purchase of reserve capacity.

3. For registration of a direct contract for the purchase of reserve capacity, submission of the following documents is required:

a) registration application in accordance with the approved form;

b) two originals of the direct contract signed and certified on all pages and annexes by the respective authorized persons of both parties.

4. A direct contract for the purchase of reserve capacity shall enter into force after registration with the dispatch licensee.

5. The electricity dispatch licensee is entitled to refuse registration of a direct contract only if:

a) any party to the direct contract is not a qualified enterprise;

b) the direct contract is not concluded for the period determined by these rules;

c) the deadlines for submitting the direct contract for registration have been violated;

d) the requirements of paragraph 3 of this Article have been violated;

e) the direct contract contradicts the requirements of normative acts adopted by the Ministry and/or the Commission;

f) dispatch of electricity (capacity) provided for by the direct contract is impossible and/or the implementation of this direct contract may hinder the operational-dispatch management of the system;

g) the capacity provided for by the direct contract does not have the structure established by these rules for reserve capacity and the corresponding degree of readiness for dispatch.

6. If the electricity dispatch licensee does not send to both parties, within 5 calendar days from submission of the contract, a notification on refusal to register the contract, then the contract shall be considered registered.

7. In case of making changes to the direct contract for the purchase of reserve capacity, the said changes shall be notified to the dispatch licensee at least 10 calendar days before the start of the next reporting period.

8. The same requirements as for registration of the contract itself apply to registration of changes to the reserve capacity purchase contract.

Article 19. Termination of the direct contract on the purchase of reserve capacity🔗

1. An application on the early termination of the direct contract on the purchase of reserve capacity must be submitted for registration to the dispatch licensee before the termination of the contract, not later than 10 calendar days.

2. The application on the termination of the direct contract on the purchase of reserve capacity shall be submitted in accordance with the approved form.

3. The fact of registration of the application on termination with the dispatch licensee shall be considered a circumstance confirming the termination of the direct contract on the purchase of reserve capacity.

4. The electricity dispatch licensee is entitled to refuse the termination of the direct contract on the purchase of reserve capacity if:

a) the conditions specified in this Article for the submission of the application on the termination of the direct contract for registration have been violated;

b) the direct contract does not provide for its unilateral termination, if the application is submitted by only one party, except where the termination of the direct contract is caused by a material breach of its terms by the other party to the direct contract.

Article 20. Purchase and sale of reserve capacity under standard terms🔗

1. The system commercial operator registers with the dispatch licensee direct contracts drawn up in the form of standard terms for the purchase and sale of reserve capacity. The requirements of Chapter 3 shall not apply to the registration and modification of these contracts.

2. The direct contracts referred to in paragraph 1 shall be applied for the purchase and sale of reserve capacity in respect of which qualified enterprises did not have registered direct contracts within the time limits established by these rules.

3. A qualified enterprise which does not have reserve capacity secured by sources established by law shall be considered a party to the direct contract referred to in paragraph 1.

4. The commercial operator may terminate the operation of the direct contracts referred to in the first Article in relation to a specific qualified enterprise, in accordance with these rules.

5. In the event of the termination by the system commercial operator, in accordance with this Article, of the direct contract referred to in paragraph 1 for a qualified enterprise, the qualified enterprise shall, within one week, submit to the dispatch licensee for registration a new direct contract on the purchase of reserve capacity.

Article 21. Provision of reserve capacity by own means of generation🔗

1. In the case of provision of reserve capacity by own means of generation, the respective qualified enterprise shall apply, with an appropriate application, to the dispatch licensee for registration.

2. A direct customer may also ensure its provision of reserve capacity by releasing capacity through restriction of its own consumption. In respect thereof, it shall apply, with an appropriate application, to the dispatch licensee for registration.

3. The same requirements as apply to the registration of a direct contract for the purchase of reserve capacity shall apply to the submission and registration of the applications referred to in the first and second paragraphs of this Article, as well as to the making of amendments thereto and the termination thereof.

Article 22. Minimum amount of reserve capacity🔗

For the purpose of ensuring the country's energy security, every wholesale buyer of electricity shall be obliged to hold reserve capacity of not less than the following amounts of its hourly forecast demand:

a) 2006-2009 – 10% (from local or imported sources);

b) 2010-2012 – 10% (including at least 5% from local sources);

c) 2013-2015 – 10% (entirely from local sources);

d) 2016-2019 – 15% (entirely from local sources).

Chapter VIIElectricity losses in the transmission network (electricity expenditure in technological processes)

Article 23. Compensation of losses in the electricity transmission network🔗

1. Normative losses in the electricity transmission network shall be compensated by distribution companies, direct customers, exporters and the system commercial operator, by way of full compensation, to the parties to direct contracts — generation licensees, importers and small capacity power plants — of the payment for the electricity delivered by them to the busbars.

2. Normative losses in the electricity distribution network shall be compensated by retail customers of electricity and those qualified enterprises that receive electricity from the distribution network. The cost of the losses is taken into account in the respective tariffs established by the Commission.

3. For the purpose of implementing the first paragraph, distribution companies, direct customers, exporters and the system commercial operator shall purchase electricity at the busbars of generation licensees, importers and small capacity power plants.

4. In the event of above-normative losses, the respective transmission licensee shall compensate the commercial operator for the payment for the electricity of the volume of the above-normative losses, according to the balancing electricity price determined by the system commercial operator for the reporting period in accordance with these Rules.

5. Financial and material liability for above-normative losses in the electricity transmission network shall be borne by the legal entity in whose ownership (on whose balance sheet) or possession (temporary use) the respective transmission network is recorded, where the above-normative losses occur.

Chapter VIIISettlement

Article 24. Contractual obligations🔗

1. Under direct contracts for the purchase and sale of electricity, the parties are entitled to agree that the volume of electricity specified in the contract, in the case of its generation, shall be fully paid for by the buyer, regardless of the occurrence of the fact of its physical consumption by this particular buyer.

2. In the event that the electricity purchase and sale contract provides for the condition referred to in the first paragraph and at the end of the reporting period it turns out that the electricity consumed by the buyer is less than the electricity generated by the electricity seller, the electricity buyer entity is considered to have acceded to the contract registered under standard conditions with the dispatch licensee by the system commercial operator and becomes the seller of this electricity to the commercial operator at the average weighted price of electricity purchased in the corresponding reporting period.

3. In the event that the electricity purchase and sale contract does not provide for the condition referred to in the first paragraph and at the end of the reporting period it turns out that the electricity consumed by the buyer is less than the electricity generated by the electricity seller, the electricity seller entity is considered to have acceded to the contract registered under standard conditions with the dispatch licensee by the system commercial operator and becomes the seller of this electricity to the commercial operator at the price of electricity specified in the direct contract concluded with the buyer in the corresponding reporting period.

Article 25. Submission of financial guarantees🔗

1. If a qualified enterprise and/or retail consumer has delayed, by more than 5 days, the payment of the cost of purchased electricity (capacity) and/or transmission, dispatch and pass-through, the electricity (capacity) seller and/or the transmission, dispatch, distribution licensees are entitled to require the respective qualified enterprises and retail consumers to provide a bank guarantee to secure the coverage of the cost of electricity (capacity) and/or transmission, dispatch, pass-through services to be purchased in the next reporting period.

2. If a qualified enterprise fails to submit the required financial guarantees, the commercial operator has the full right not to allow it to trade in balancing electricity, while production licensees, small capacity power plants, transmission, dispatch and distribution licensees — to terminate the supply of electricity and/or services to this consumer in accordance with these rules.

3. If the buyer of electricity (capacity), transmission, dispatch, pass-through services (including balancing electricity), a qualified enterprise and/or retail consumer, delays the payment of the fee for electricity (capacity) or services, it shall be obliged to compensate the direct costs related to such delay.

4. Within 25 days after the end of the reporting period (unless otherwise determined by a direct contract), in the event of non-payment of the fee for electricity (capacity) or services by buyer qualified enterprises and/or retail consumers, or in the event of failure to submit bank guarantees in accordance with this article, the electricity (capacity) seller, the qualified enterprise or the respective licensee providing the service is entitled to apply to the electricity dispatch licensee for the suspension of the respective direct contract.

5. Upon receipt of such notification, the dispatch licensee shall be obliged to notify the respective buyer of the full or partial termination of electricity supply 72 hours in advance. If during this period the respective qualified enterprise or licensee does not change the application sent to the dispatch licensee, the dispatch licensee suspends the operation of the contract and carries out the full or partial termination of electricity supply to the qualified enterprise.

Article 26. Data collection🔗

1. Every qualified enterprise shall be obliged to record, by the means available in its possession and/or management, the quantity of electricity generated, supplied to the balance, transmitted, consumed and distributed by it, in accordance with these rules.

2. Qualified enterprises shall make the said data available to the electricity dispatch licensee, the system commercial operator, and also to their counterparties.

3. At stations and substations where receipt and delivery points are located, operational logs of the readings of accounting and technical meters shall be kept, which shall be certified by the interested parties, the dispatch licensee and the system commercial operator. The readings of the accounting and technical meter shall be entered in the operational log on an hourly basis.

4. At those stations and substations where hourly taking of meter readings is impossible, meter readings shall be taken and entered in the operational log at least once every 10 days. The list of the said stations and substations shall be drawn up by the system commercial operator.

5. At the end of each reporting period, the qualified enterprise shall, together with the authorised representatives of all parties participating in the receipt and delivery of electricity at the delivery and receipt points, on the basis of the entries in the operational log of the readings of the settlement meter(s) (according to voltages), draw up an act (acts) of acceptance and handover of the generated, supplied and consumed electricity in the established form.

6. The number of originals of the acts shall be determined by the number of counterparties of the qualified enterprise, and also two originals each for the commercial operator and the dispatch licensee.

7. At stations and substations, persons responsible for metering control shall be appointed by order of the respective qualified enterprises and transmission licensees. The responsible person shall be obliged to exercise systematic control over the correctness of taking meter readings, the keeping of the operational log and the drawing up of the respective balance at the stations and substations.

8. Properly executed and certified acts shall be submitted to the system commercial operator no later than 4 calendar days after the end of the reporting period.

9. Failure to submit the said acts within the specified period shall result in the fining of the qualified enterprise under the terms of the contract concluded with the commercial operator.

10. Amendments to the act of acceptance and handover of the generated, supplied and consumed electricity shall be made in the same manner as provided for the execution of this act.

Article 27. Metering Register and Data Management🔗

1. The commercial operator shall enter the readings recorded in the acceptance and handover acts for generated, supplied and consumed electricity into the unified wholesale trade database.

2. The system commercial operator shall, within 7 calendar days, process the data by comparing them with their contractual volumes and shall submit to qualified enterprises and transmission-dispatch licensees information on the performance of contracts registered by them, the use of reserve capacities and the volumes of balancing electricity.

3. If qualified enterprises do not agree with the information processed and submitted by the system commercial operator, they must notify the commercial operator in writing within 2 calendar days, stating the reasoned grounds for the disagreement. For the purpose of resolving the disagreement, a working group shall be created with the participation of the system commercial operator, the dispatch licensee and the relevant qualified enterprises.

4. The working group must adopt a final decision within no more than 2 calendar days. The conclusion drawn up by the working group must be formalized in the form of a protocol. If any party does not agree with the decision of the working group, that decision must be appealed in accordance with the applicable legislation.

5. The acceptance and handover acts for generated, supplied and consumed electricity and the official information submitted by the system commercial operator in accordance with this article shall be the basis for effecting settlements between the parties.

6. Settlements for electricity purchased by qualified enterprises from the system commercial operator must be effected within a maximum of 15 calendar days after the end of the reporting period.

Chapter IXElectricity (Capacity) Transmission, Dispatch and Transit Services

Article 28. Purchase of Electricity Transmission, Dispatch and Transit Services🔗

Electricity transmission, dispatch and transit services shall be carried out only under a corresponding direct contract for the purchase of electricity transmission, dispatch and transit services.

Article 29. Direct contract for the purchase of electricity (capacity) transmission, dispatch and pass-through services🔗

1. A direct contract for the purchase of electricity (capacity) transmission, dispatch and pass-through services shall be submitted for registration to the dispatch licensee.

2. Any amendment and/or addition to a direct contract shall be made in the form of a written contract. Such amendment of a direct contract shall be submitted for registration to the dispatch licensee.

3. Every qualified enterprise shall have a direct contract for the purchase of electricity (capacity) transmission and dispatch services.

4. Every qualified enterprise that receives electricity using the distribution network, as well as those retail consumers that purchase electricity from small capacity power plants, shall have the corresponding contract for electricity pass-through services.

Chapter XElectricity (capacity) balance

Article 30. Annual balance of electricity (capacity)🔗

1. In order to draw up the annual forecast balance of electricity (capacity), the electricity dispatch licensee shall, not later than 1 July of each calendar year, receive applications of the established form submitted by qualified enterprises on the supply and demand of electricity (capacity) for the period from 1 September of the respective year through 31 August of the following year.

2. Not later than 20 July of each calendar year, the dispatch licensee, taking into account the applications received and the actual balance of electricity (capacity) of the previous year, shall process and send to the Ministry for approval the forecast balance of electricity (capacity) for the following year.

3. The Ministry shall approve the forecast balance of electricity (capacity) submitted by the dispatch licensee not later than 1 August of each year. The annual balance of electricity (capacity) covers the period from 1 September of the current year through 31 August of the following year.

Article 31. Supply and Consumption Plans🔗

1. Within the approved balance of electricity (capacity), the daily and hourly planning of generation facilities and supply sources shall be carried out by the dispatch licensee, in accordance with direct contracts concluded between qualified enterprises.

2. For this purpose, qualified enterprises shall be obliged to officially submit to the dispatch licensee, in accordance with the contracts concluded by them, applications for the supply and consumption of electricity (capacities) for the next day, month, quarter and year, in the established form.

3. The electricity dispatch licensee shall be obliged, upon approval of the plans for generation facilities and supply sources, to officially notify the qualified enterprises thereof.

4. The fulfilment of the electricity (capacity) supply and consumption plan drawn up by the dispatch licensee shall be mandatory for all persons engaged in the production, export, import, transmission, distribution, dispatch, consumption and transit of electricity. These plans impose specific obligations and responsibilities on each of them.

5. Qualified enterprises shall be obliged to unconditionally fulfil the operational requirements issued by the dispatch licensee within its competence, except in cases provided for by legislation.

6. The commercial operator of the system shall be obliged to ensure systematic monitoring of compliance by qualified enterprises with the obligations set out in the plans for generation facilities and supply sources.

7. The electricity dispatch licensee shall be obliged to:

a) plan and dispatch the unified energy system in such a way that the electricity parameters (frequency, voltage and others) comply with the established standards;

b) ensure the balancing of electricity supply and consumption at any point in time;

c) provide the commercial operator daily with records of all the instructions and directions it issued throughout the day, as well as of all changes made to the pre-drawn electricity (capacity) supply and consumption plan.

Chapter XIWholesale Accounting of Electricity

Article 32. Purpose of Electricity Metering in the Electric Power System🔗

1. The main purpose of electricity metering in the energy system is to obtain accurate information on the import, export, transit, generation, transmission, distribution and consumption of electricity for the purpose of making appropriate settlements between qualified enterprises for electricity (capacity).

2. The metering system shall ensure assessment of the quantity of electricity and the averaged volume of capacity:

a) generated by the generators of power plants;

b) consumed for the own and auxiliary needs of power plants and substations (separately);

c) consumed for production needs in the energy sector;

d) supplied (transmitted) directly to consumers through lines outgoing from the busbars of the power plant;

e) transmitted to or received from the network of another owner;

f) supplied to consumers from the electricity network;

g) transmitted by export and received by import;

h) passing in transit from one country to another (through Georgia).

3. The organization of active power metering shall make it possible to solve such tasks as:

a) determination of the amount of electricity supplied in wholesale supply networks of different voltage classes in the energy system;

b) preparation of electricity (capacity) balances at all levels of the wholesale supply network of the energy system;

c) control over compliance by qualified enterprises with the established regimes of electricity consumption and electricity (capacity) balances;

d) settlements with qualified enterprises for consumed electricity at the effective tariffs, including multi-stage and differentiated tariffs.

4. Reactive electricity metering shall make it possible:

a) to determine the reactive power received by or supplied to qualified enterprises;

b) to meter the reactive electricity generated by compensating devices.

c) to ensure control over the transmission of reactive electricity via inter-system lines.

d) to determine the power generated by the generator.

5. Metering devices, as well as electricity quality control devices, shall comply with the requirements of the "Rules for the Arrangement of the Operation of Energy Facilities and Other Technical Means in the Energy Sector and Their Use" and the "Rules for the Supply and Consumption of Electricity (Capacity)" and shall be entered in the register of measuring instruments. The said instruments shall be installed in accordance with the instructions for the arrangement of electrical equipment.

Article 33. Principles of electricity metering🔗

1. In accordance with established standards, applicable norms and requirements, a qualified enterprise and the licensee of transmission and electricity dispatch shall be obliged to record the full quantity of electricity and capacity produced, supplied, transmitted or received at the points of receipt or transmission. To submit to the dispatch licensee and the commercial operator all metering data and, upon request, ensure the availability of this information to any other contractor or physically connected party. The commercial operator of the system is entitled to conduct inspection of the settlement metering system of any qualified enterprise or licensee.

2. For each micro-unit a metering point shall be determined, at which an electricity meter shall be installed and a metering system shall be arranged.

3. A qualified enterprise, the licensee of generation, transmission, electricity dispatch is responsible for the installation, proper functioning and operation of the metering system at its metering point in accordance with the requirements of these rules.

4. The commercial operator shall provide qualified enterprises and licensees with a list of priorities, on the basis of which the qualified enterprises and licensees shall, within 6 months, bring the metering systems in its possession into compliance with the requirements of the "Rules for the arrangement of the operation of energy facilities and other technical means in the energy sector and their use" and the "Rules for the supply and consumption of electricity (capacity)".

5. The costs of installation or renewal, adjustment and commissioning, servicing and operation of electricity metering devices at own metering points shall be borne by the qualified enterprise and/or the respective licensee of transmission and dispatch.

6. The electricity metering system and devices shall be protected from unauthorised interference in their operation, so that no alteration of or tampering with the meter readings occurs.

7. Qualified enterprises and licensees have the right to receive from the metering database of the system's commercial operator the information relating to the electricity and/or capacity produced, transmitted or consumed by them.

8. Metrological control of the measurement method used for electricity metering shall be carried out in accordance with applicable legislation.

Article 34. Data storage🔗

1. Metering data shall be stored in the metering database:

a) for 13 months in an accessible format;

b) for 6 years in the archive.

2. In the event of errors admitted in electricity metering, the recalculation of metering data shall be carried out from the previous period when the last technical inspection of the device was conducted, but not more than 6 months.

Article 35. Responsibility for Metering🔗

1. The qualified enterprise, licensee, on whose balance sheet the meter installation device is located, shall be materially and legally liable for the protection of the settlement instruments, the integrity of the seals placed on them, damage caused by human interference, as well as for the violation of metering circuits.

2. The owner of the meter shall affix an appropriate marking (label) to each part of the metering device (covers of current and voltage transformer cabinets, connection boxes, pull boxes, terminal boxes, branch boxes, test blocks, meter covers and meters), which shall correspond to the registration data with the commercial operator.

3. Qualified enterprises and transmission licensees shall ensure, at any time of day or night, unrestricted access of the authorized representative of the system commercial operator to the settlement instruments.

Article 36. Metering Register🔗

1. The system commercial operator shall create and maintain a unified metering register, which contains complete information on the metering points of electricity (capacity) wholesale purchase and sale relations.

2. The register shall include:

a) registration of metering points;

b) data on the inspection of metering points.

Chapter XIIDispute Resolution

Article 37. Dispute Resolution🔗

Disputes related to these Rules shall be resolved in accordance with the legislation of Georgia.

Chapter XIIITransitional Provisions

Article 38. Matters to be regulated for the transitional period in connection with the introduction of these Rules🔗

1. The purchase and sale of reserve capacity for those qualified enterprises whose metering does not make it possible to obtain hourly readings of the meters — they trade in reserve capacity only through the system commercial operator.

2. The supply of electricity to the territory of Abkhazia shall be carried out from the Enguri Hydroelectric Power Plant according to the volumes of the approved forecast balance of electricity (capacity). The Enguri Hydroelectric Power Plant shall deduct from its output the amount of electricity supplied to the territory of Abkhazia and shall record it in accordance with these Rules and the tariff established by the Commission. Electricity supplied by the Enguri Hydroelectric Power Plant to the territory of Abkhazia shall be deemed supplied in accordance with these Rules.

3. In July and August 2006, in the event of non-payment by the buyers of the Union (Association) Electricity Wholesale Market of the fee for the electricity purchased on the Union (Association) Electricity Wholesale Market and of the membership fee, Elektrobazar shall be entitled to demand from the dispatch licensee the termination or restriction of the supply of electricity to the buyers of the Union (Association) Electricity Wholesale Market.