Text of the document

📑 Contents (33 articles)

State Registration Code 330.090.020.22.024.012.012

Order No. 1-1/1254 of the Minister of Economic Development of Georgia

8 July 2008

Tbilisi

On Approval of the Basic Provisions for the Regulation of the Use and Development of Settlement Territories

Pursuant to paragraph 1 of Article 36 of the Law of Georgia "On the Fundamentals of Spatial Planning and Urban Development", I order:

1. The attached "Basic Provisions for the Regulation of the Use and Development of Settlement Territories" shall be approved.

2. Upon entry into force of this Order, the Order No. 59 of 21 September 2001 of the Minister of Urbanization and Construction of Georgia on approval of "Natural Lighting and Insolation, Construction Norms and Rules" (LHG III, 2001, No. 104, Art. 758) and the Order No. 57 of 18 September 2001 of the Minister of Urbanization and Construction of Georgia on approval of "Rules for Construction of Residential Houses, Auxiliary and Other Buildings on and near the Boundaries of Plots" (LHG III, 2001, No. 100, Art. 724) shall be considered invalid.

3. This Order shall enter into force from 10 September 2008.

E. Sharashidze

Attachment

Basic Provisions for the Regulation of the Use and Development of Settlement Territories

Chapter IGeneral Provisions

Article 1. Subject of Regulation of the Basic Provisions for the Regulation of the Use and Development of Settlement Territories🔗

The Basic Provisions for the Regulation of the Use and Development of Settlement Territories (hereinafter – the Basic Provisions for Development) are drawn up in accordance with the requirements of the Law of Georgia "On the Fundamentals of Spatial Planning and Urban Development", constituting part of the urban development regulation system, regulate specific legal relations of urban development for territories, and determine the rights and obligations of participants in these legal relations and third parties.

Article 2. Objectives of the Basic Provisions for the Regulation of the Use and Development of Settlement Territories🔗

The objectives of the Basic Provisions for Development are, throughout the entire territory of the country:

a) determination of the rules for the regulation of the use and development of settlement territories;

b) determination of the composition of the general land use plan and the development regulation plan;

c) formation, elaboration, approval of the objectives of spatial-territorial planning documents for settlements, introduction of amendments thereto, and publicity of these processes;

d) establishment of conditions for the placement of buildings on land plot(s) and determination of their maximum heights;

e) ensuring private and public interests for the purpose of sustainable development of settlements.

Article 3. Definitions of Terms🔗

1. General Land Use Plan – General Land Use Plan – an urban planning document that determines the main parameters of the use (land use) and development of settlement territories, the spatial-territorial conditions protecting improvement, the environment and immovable cultural heritage, the spatial aspects of transport, engineering and social infrastructure, as well as economic development, and the territorial issues of settlement;

2. Development Regulation Plan – an urban planning document that establishes land use zones (subzones) for settlement territories and/or specifies the architectural-planning and spatial-volumetric characteristics of individual planning units and development, the placement of buildings, and their planning parameters; specifies the urban planning characteristics of the protection and development of immovable cultural heritage, the organization of relief, the improvement and greening of territories, and the provision of engineering and transport infrastructure;

3. Development Regulation Line(s) (red line(s)i) – an imaginary boundary established by an urban planning document for a land plot (plots), beyond which buildings and structures must be located; one or several red lines may be established for a land plot (plots);

4. Mandatory Development Lines (blue lines) – an imaginary boundary established by an urban planning document for a land plot (plots), on which buildings and structures must be located; one or several blue lines may be established for a land plot (plots);

5. Settlement – the common name for different forms (types) of settlement (city, town, village);

6. Settlement Development – the process and/or management of the development of the physical environment and infrastructure of the territories of settlements (city, town, village), which is reflected in urban planning documents;

7. Reference surface of a building – all surfaces of a building from the ground surface to the reference edge of the roof that form an angle of 70 to 90 degrees with respect to the horizontal projection of the ground surface;

8. Reference height of a building facade – the average height of the building facade, which is equal to the average height of the reference surface of the facade. In the case where the total width of the gables projecting on the corresponding side of the facade and other similar volumetric elements of the roof constitutes more than 1/2 of the average width of the reference surface of the same facade, then when determining the reference height of the building facade, the height of the gables projecting on the corresponding side of the facade and other similar volumetric elements of the roof is added to the average height of the reference surface of the facade;

9. Reference edge of the roof – in the case of a pitched roof, the imaginary line of intersection of the reference surface of the building and the planes of the building's roofing. In the case of a flat roof, the finishing line of the reference surface of the building;

10. Shared wall – a wall located on the neighbourhood boundary, part of which may constitute one of the walls of the building(s) located on the adjacent plots. A retaining wall located on, or to be constructed on, the neighbourhood boundary is also shared;

11. Fence – constitutes a structure demarcating land plots, which may be located both on the cadastral boundary (shared fence) and within the boundaries of a land plot. If the mark of intersection of the fence and the ground surface differs on different sides of the fence, then the maximum height of a solid fence is determined from the higher mark;

12. Public space – a street, square, bridge, small square, park, garden, water surface and its coastal strip, natural or artificial landscape, passage between land plots and other spaces of a similar type located within the boundaries of built-up territories;

13. Street – a public space intended for movement located within the boundaries of built-up territories, which may consist of only a carriageway for pedestrians (a sidewalk), only a carriageway intended for transport, or a carriageway intended for transport and a carriageway for pedestrians (a sidewalk);

14. Above-ground floor – a floor the average height of the elevation of the floor level from the ground surface of which is 1.8 metres (to the nearest tenth) or more;

15. Underground floor – a floor the average height of the elevation of the ceiling from the ground surface of which does not exceed 1.8 metres (to the nearest tenth);

16. Ground-level floor – a floor the average height of the elevation of the floor level from the ground surface of which is up to 1.8 metres (to the nearest tenth), while the average height of the elevation of its ceiling from the ground surface exceeds 1.8 metres (to the nearest tenth);

17. Regulation – the conditions and characteristics of the use and development of territories, established on the basis of the rules for regulating the use and development of the territories of settlements;

18. Veranda – a roofed space bounded by walls on one or two sides or not bounded by walls and enclosed from the open side/sides by a railing;

19. Bay window – a roofed space projecting from the plane of the building facade, bounded by walls and glazed openings, which constitutes part of the main structure of the building;

20. Loggia – a habitable space recessed into the building facade, roofed, bounded by walls on three sides and open from the facade side and enclosed by a railing;

21. Balcony – a horizontal structural/cantilever plane projecting from the plane of the building facade, enclosed by a railing, which constitutes part of the main structure of the building and is connected to its interior space;

22. Mansard – constitutes the attic space existing above the upper surface of the roof covering of the last floor of a building, between the external walls, the inner surfaces of the slope(s) of the pitched roof and the rafters arranged thereon, which is used for dwelling/living. A mansard shall be considered a full floor when the average height from 3/4 of the area of the attic floor surface to the mansard ceiling is 2.4 metres (accurate to one tenth) or more;

23. rear yard of a construction land plot – for the purpose of placing buildings on a construction land plot, that part (area) of the construction land plot which is located between the neighbourhood boundary/boundaries opposite (non-adjacent) to the public boundary/boundaries and the red line(s) established in accordance with Article 26 of these Basic Provisions of Development;

24. full floor – a floor whose average height from the floor level to the ceiling is 2.4 metres or more;

25. incomplete floor – a floor whose average height from the floor level to the ceiling is from 1.8 metres to 2.4 metres;

26. technical floor – a floor whose average height from the floor level to the ceiling is less than 1.8 metres;

27. terrace (flat roof) – an uncovered area bounded by walls on one, two, three or four sides and, where necessary, enclosed on the open side/sides by a railing, as well as such a flat roof or part of a flat roof whose surface is finished in such a way that it can be used for living and which is enclosed on the open side/sides by a railing and/or parapet. A marquise and a sunshade may be arranged on the terrace;

28. water protection area – the surface water surfaces of the sea, lake, reservoir and river, as well as the territories of the coastal strips, floodplains and underground water-collecting system necessary for their existence.

Chapter IIRules for the Regulation of the Use and Development of the Territories of Settlements

Article 4. Rules for the Regulation of the Use and Development of Settlement Territories🔗

1. The purpose of the rules for the regulation of the use and development of settlement territories is to establish specific conditions for the use of territories and land plot(s) for construction activity. These conditions shall be reflected in urban planning documents.

2. On the basis of this Chapter, the elaboration of the zoning part of urban planning documents shall be carried out.

3. The rules for the regulation of the use and development of settlement territories include:

a) conditions for the elaboration of the zoning part of urban planning documents;

b) conditions for the use and development of specific land plot(s), when there are no legal zoning documents in the respective territory;

c) the functioning of the Commission on Issues of Regulation of the Use and Development of Settlement Territories;

d) the rules for the issuance of a special zoning agreement.

4. For cultural heritage and environmental protection zones, the use of territories and the regulation of development shall be carried out in accordance with existing development, the main provisions of development, and the requirements of cultural heritage and environmental protection legislation.

Article 5. Composition of Zoning Documents for Settlement Territories🔗

1. The zoning documents for settlement territories are:

a) the general legal zoning document for land use;

b) the specific legal zoning document for land use.

2. The land use zoning document includes:

a) general functional zones;

b) territorial-structural zones;

c) zones of special construction regulation;

d) specific cultural heritage and environmental protection zones.

3. The specific legal zoning documents for land use include:

a) conditions for the regulation of the use and development of settlement territories;

b) coefficients of land plot development, development intensity and greening;

c) specific functional zones and the requirements imposed on them by this Chapter;

d) specific cultural heritage and environmental protection zones.

Article 6. Boundaries of zones determined by general legal zoning documents for land use🔗

1. The territory of each zone of the general legal zoning document for land use shall be delimited by boundaries.

2. When establishing the boundaries of the territories of zones, as a rule, the following shall be used:

a) administrative boundaries of the territory of settlements;

b) boundaries of built-up territories of settlements;

c) natural and artificial boundaries/dividing lines;

d) boundaries of protected areas;

e) boundaries/limits of the territory of a specific cultural heritage monument and/or the territory of protection zones;

f) boundaries of residential, public-business, industrial, recreational territories;

g) boundaries of the territories of streets and highways;

h) boundaries of the territories of railways, pipelines and other engineering infrastructure and/or the right-of-way strip.

3. The delineation of the territory of the zones of general legal zoning of land use is carried out as a result of establishing the boundaries of functional, cultural heritage and environmental protection zones.

Article 7. Conditions for the regulation of use and development of settlement areas defined by specific legal zoning documents for land use and boundaries of zones🔗

1. For the territorial zones reflected in the specific legal zoning document for land use, the following shall be established by regulations:

a) the main parameters for the regulation of development of construction land plots on the territories of the zones and their permissible indicators;

b) on the territories of the zones, a list of objects whose placement is inadmissible may be established.

2. The main parameters for the regulation of development of construction land plots shall include:

a) the maximum coefficient of development of land plots;

b) the maximum coefficient of development intensity of land plots and/or the maximum height of development of land plots;

c) the minimum coefficient of landscaping of land plots.

3. The main parameters for the regulation of development of construction land plots may also include:

a) maximum indicators for the number of storeys/height of development and/or volume;

b) minimum and maximum dimensions of the area(s) of land plots;

c) development regulation lines (red lines);

d) mandatory development lines (blue lines);

e) the number of parking spaces for motor vehicles;

f) conditions of the spatial-planning arrangement of development (e.g., placement of building facades along one line, pairing of buildings, determination of building heights, determination of the type of roofing of buildings, and others);

g) other parameters whose values and indicators are established by the development regulation plan and/or other normative acts.

4. The territory of each zone of the specific legal zoning document for land use shall be delimited by boundaries.

5. When establishing the boundaries of the territories of zones, as a rule, the following shall be used:

a) administrative boundaries of the territory of settlements;

b) boundaries of developed territories of settlements;

c) natural and artificial boundaries/limits;

d) boundaries of protected areas;

e) boundaries/limits of the territory of a specific cultural heritage monument and/or the territory of protection zones;

f) boundaries of residential, public-business, production, recreational territories;

g) boundaries of the territories of streets and highways and their axial and/or center lines;

h) boundaries of the territories of railways, pipelines and other engineering infrastructure and/or the right-of-way strip;

i) boundaries of individual land plots located at the edge of the territories of zones.

6. The delineation of the territory of specific legal zones for land use is carried out as a result of establishing the boundaries of functional, cultural heritage and environmental protection zones.

7. When establishing the boundaries of legal zones, when functional zones are overlapped by cultural heritage and environmental protection zones, the regulation defined for cultural heritage and environmental protection zones shall apply within the boundaries of such territory.

Article 8. Land Plot Development Coefficient K-1🔗

1. The land plot development coefficient K-1 determines the maximum part of the territory of a specific land plot on which the placement of buildings or structures is permitted.

2. Coefficient K-1 is determined by the area contained within the outer perimeter of the floor surface of the ground floor of the building or structure.

3. If a building or structure does not have a ground floor, then coefficient K-1 is determined by the area contained within the outer perimeter of the floor surface of the first above-ground floor.

4. The calculation area determined by the land plot development coefficient does not include:

a) underground floor(s) of buildings or structures;

b) a vehicle passage arranged in the building at street surface level;

c) buildings or structures that do not require a construction permit.

5. Coefficient K-1 is rounded to the nearest tenth.

Article 9. Land plot development intensity coefficient K-2🔗

1. The land plot development intensity coefficient K-2 determines, in an individual zone, the total area of the surfaces of the main structures of the floors of the ground-level and above-ground storeys of a building/structure permissible on the territory of a specific land plot.

2. The calculated area of the K-2 coefficient is calculated in accordance with the list defined below:

a) the area of the surface enclosed within the outer contour of the main structure of the floor of a full ground-level and above-ground storey – is included in full in the calculated area of the K-2 coefficient;

b) the area of the surface of the floor structure of an incomplete storey – is included in the calculated area of the K-2 coefficient by 1/2;

c) in an attic in which a mansard is arranged that constitutes a full storey, then such mansard – is included in the calculated area of the K-2 coefficient by 3/4 of the area of the surface of the main structure of the floor of such attic;

d) in an attic in which a mansard is arranged that constitutes an incomplete storey, then such mansard – is included in the calculated area of the K-2 coefficient by 1/3 of the area of the surface of the main structure of the floor of such attic;

e) the part of the total area of the surface of the main structure of the floor of the stairwell existing on the ground-level storey and of the elevator shaft existing on the corresponding storey that exceeds 60 m² – is included in full in the calculated area of the K-2 coefficient;

f) at the level(s) of intersection of the building and the street surface, the part of the total area of the road surface of the tunnel arranged for vehicle passage into the building that exceeds 50 m² – is included in full in the calculated area of the K-2 coefficient;

g) the part of the total area of the surface of the main structure of the floor of the stairwell existing on the first above-ground storey and of the elevator shaft existing on the corresponding storey that exceeds 60 m² – is included in full in the calculated area of the K-2 coefficient;

h) except for the first above-ground storey, the part of the total area of the surface of the main structure of the floor of the stairwell existing on another above-ground storey and of the elevator shaft existing on the corresponding storey that exceeds 40 m² – is included in full in the calculated area of the K-2 coefficient;

i) the part of the total area of the surface of the main structure of the balcony floor that protrudes from the outer wall of the facade of the building/structure by a distance of more than 1.5 m – is included in full in the calculated area of the K-2 coefficient;

j) the area of the surface of the main structure of the floor of a veranda, bay window, loggia – is included in full in the calculated area of the K-2 coefficient.

3. The calculated area of the K-2 coefficient is rounded to the nearest tenth.

Article 10. Greening coefficient of a land plot K-3🔗

1. The greening coefficient of a land plot determines the minimum share of the area of the land plot territory which must not be covered or overlaid with any waterproof (construction or other) material, beneath which there must be no structure or enclosure, and which is intended for greening.

2. The greening coefficient of a land plot is the minimum indicator of the ratio of the greened surface of the land plot to the total area of the land plot.

3. Rounding of the K-3 coefficient is possible with an accuracy of one tenth.

Article 11. Functional zones🔗

1. For the purposes of implementation of legal zoning documents, the territories of settlements are divided into:

a) general functional zones:

a.a) landscape-recreational zone – (LSZ);

a.b) agricultural zone – (SOPZ);

a.c) recreational zone – (RZ);

a.d) resort-recreational zone – (SRZ);

a.e) special zone – (SPETSZ);

a.f) residential zone – (SZ);

a.g) transport zone – (TZ);

a.h) public-business zone – (SSZ);

a.i) industrial zone – (r);

a.j) sanitary zone – (SANZ);

a.k) military purpose zone – (SDZ).

b) specific functional zones:

b.a) landscape-recreational zone' – (LSZ');

b.b) agricultural zone' – (SOPZ');

b.c) recreational zone' – (RZ');

b.d) resort-recreational zone 1 (SRZ-1)

b.e) resort-recreational zone 2 (SRZ-2)

b.f) special zone' – (SPETSZ');

b.g) residential zone 1 – (SZ-1);

b.h) residential zone 2 – (SZ-2);

b.i) residential zone 3 – (SZ-3);

b.j) residential zone 4 – (SZ-4);

b.k) residential zone 5 – (SZ-5);

b.l) residential zone 6 – (SZ-6);

b.m) transport zone 1 – (TZ-1);

b.n) transport zone 2 – (TZ-2);

b.o) public-business zone 1 – (SSZ-1);

b.p) public-business zone 2 – (SSZ-2);

b.q) public-business zone 3 – (SSZ-3);

b.r) industrial zone 1 – (S-1);

b.s) industrial zone 2 – (S-2);

b.t) sanitary zone' – (SANZ');

b.u) military purpose zone 1 – (SDZ-1);

b.v) military purpose zone 2 – (SDZ-2).

2. The division of a territory into general functional zones is reflected in the general legal zoning document of land use corresponding to the general plan of land use.

3. The division of a territory into specific functional zones is reflected in the specific legal zoning document of land use corresponding to the development regulation plan.

Article 12. Specific functional zones🔗

1. Landscape-recreational zone’ (LRZ’) constitutes an area of natural landscape or valuable artificial landscape within the (administrative) boundaries of a settlement, where buildings and structures ensuring its functioning may exist in accordance with legislation.

2. Agricultural zone’ (AGZ) constitutes agricultural areas existing within the (administrative) boundaries of a settlement, where auxiliary buildings and structures ensuring its functioning may exist in accordance with legislation.

3. Recreational zone’ (RZ’) constitutes a recreational zone which is located within the boundaries of built-up areas and includes green areas (e.g.: park, garden, boulevard, square, lawn), open playgrounds and other areas of a similar type, where buildings and structures ensuring the functioning of the recreational zone (RZ) may exist in accordance with legislation.

4. Resort-recreational zone 1 (RRZ-1):

a) constitutes a zone which is located within the boundaries of built-up areas, where placement of buildings and structures for recreational, treatment, sports and entertainment purposes is permitted;

b) maximum area of the land plot – 1000 m2

c) maximum development height on the land plot – 12 metres.

d) coefficients:

d.a) maximum land plot development coefficient (K-1) – 0.6;

d.b) land plot greening coefficient (K-3) – 0.3.

5. Resort-recreational zone 2 (RRZ-2):

a) constitutes a zone which is located within the boundaries of built-up areas, where placement of buildings and structures for recreational, treatment, sports and entertainment purposes is permitted;

b) coefficients:

b.a) maximum land plot development coefficient (K-1) – 0.3;

b.b) land plot development intensity coefficient (K-2) – up to 3.0

b.c) land plot greening coefficient (K-3) – 0.1.

6. Special zone’ – (SPZ’) constitutes areas designated for cemeteries.

7. Residential zone 1 (RZ-1):

a) may exist only on the territory of rural-dacha development;

b) the dominant type of development is residential houses. Also permitted is the existence of buildings and structures for agricultural purposes in accordance with legislation, including, in compliance with the principles of neighbourly tolerance;

c) coefficients:

c.a) maximum land plot development coefficient (K-1) – 0.5;

c.b) land plot development intensity coefficient (K-2) – up to 0.8;

c.c) land plot greening coefficient (K-3) – 0.3.

8. Residential zone 2 (RZ-2):

a) the dominant type of development is residential houses. Also permitted is the existence of public purpose facilities in accordance with legislation, including, in compliance with the principles of neighbourly tolerance;

b) coefficients:

b.a) maximum land plot development coefficient (K-1) – 0.5;

b.b) land plot development intensity coefficient (K-2) – up to 0.6;

b.c) Greening coefficient of land plots (K-3) – 0.25.

9. Residential Zone 3 (RZ-3):

a) Low-intensity residential zone, where the dominant type of development is residential houses. The existence of public-purpose facilities is also permissible in accordance with legislation, including in compliance with the principles of neighbourhood tolerance;

b) Coefficients:

b.a) Maximum development coefficient of the land plot (K-1) – 0.5;

b.b) Development intensity coefficient of the land plot (K-2) – from 0.6 to 1.3;

b.c) Greening coefficient of land plots (K-3) – 0.2.

10. Residential Zone 4 (RZ-4):

a) High-intensity residential zone, where the dominant type of development is residential houses. The existence of public-purpose facilities is also permissible in accordance with legislation, including in compliance with the principles of neighbourhood tolerance;

b) Maximum area of the land plot – 300 m²;

c) Maximum height of development on the land plot 12 metres;

d) Coefficients:

d.a) Maximum development coefficient of the land plot (K-1) – 0.7;

d.b) Greening coefficient of land plots (K-3) – 0.1.

11. Residential Zone 5 (RZ-5):

a) Medium-intensity residential zone, where the dominant type of development is residential houses. The existence of public-purpose facilities is also permissible in accordance with legislation, including in compliance with the principles of neighbourhood tolerance;

b) Coefficients:

b.a) Maximum development coefficient of the land plot (K-1) – 0.5;

b.b) Development intensity coefficient of the land plot (K-2) – from 1.3 to 1.8;

b.c) Greening coefficient of land plots (K-3) – 0.1.

12. Residential Zone 6 (RZ-6):

a) High-intensity residential zone, where the dominant type of development is residential houses. The existence of public-purpose facilities is also permissible in accordance with legislation, including in compliance with the principles of neighbourhood tolerance;

b) Coefficients:

b.a) Maximum development coefficient of the land plot (K-1) – 0.5;

b.b) Development intensity coefficient of the land plot (K-2) – from 1.8 to 2.2;

b.c) Greening coefficient of land plots (K-3) – 0.1.

13. Transport Zone 1 (TZ-1) constitutes a transport zone located within the boundaries of built-up areas and includes streets (including sidewalks), squares, open parking lots, railway lines and train parking areas (depots).

14. Transport Zone 2 (TZ-2) constitutes a transport zone located outside the boundaries of built-up areas and includes roads, open parking lots, vehicle servicing and other areas of a similar type. The existence of public places/premises ensuring the functioning of Transport Zone 2 (TZ-2) (e.g.: airport, seaport, bus station, railway station and others) is possible in accordance with legislation.

15. Public-Business Zone 1 (PBZ-1):

a) medium-intensity public-business zone without a dominant type of development (mixed zone);

b) coefficients:

b.a) maximum coefficient of development of the land plot (K-1) – 0.6;

b.b) coefficient of development intensity of the land plot (K-2) – up to 3.0;

b.c) coefficient of greening of land plots (K-3) – 0.1.

c) residential dwellings supporting the functioning of the public-business zone may exist in accordance with legislation.

16. Public-business zone 2 (SSZ-2):

a) high-intensity development zone where the dominant type is constituted by objects of public purpose;

b) coefficients:

b.a) maximum coefficient of development of the land plot (K-1) – 0.7;

b.b) coefficient of development intensity of the land plot (K-2) – from 3.0 to 5.0;

b.c) coefficient of greening of land plots (K-3) – 0.1.

c) residential buildings/dwellings supporting the functioning of the public-business zone may exist in accordance with legislation.

17. Public-business zone 3 (SSZ-3):

a) high-intensity development zone where the dominant type is constituted by objects of public purpose;

c) maximum height of development on the land plot is 15 metres;

d) coefficients:

d.a) maximum coefficient of development of the land plot (K-1) – 0.7;

d.b) coefficient of greening of land plots (K-3) – 0.1.

18. Industrial zone 1 (S-1):

a) industrial zone where the dominant type of development is constituted by industrial objects in which production processes hazardous/harmful to the environment and human health do not take place;

b) public buildings/dwellings supporting the functioning of industrial zone 1 (S-1) may exist in accordance with legislation.

19. Industrial zone 2 (S-2) constitutes a zone where the dominant type of development is constituted by industrial objects in which production processes hazardous/harmful to the environment and human health take place. The territories of landfills also belong to this zone.

20. Sanitary zone (SANZ) constitutes a zone which protects another zone from harmful impact and at the same time has a health-improving function.

21. Military-purpose zone 1 (SDZ-1) constitutes a territory of military purpose where buildings and structures of military purpose are located.

22. Military-purpose zone 2 (SDZ-2) constitutes a territory of military purpose where a training polygon is located.

23. If a specific land plot falls within the area of operation of more than one specific functional zone, then, when developing it for the purposes of construction activity, the requirements of none of these functional zones shall be violated.

Article 13. Cultural Heritage and Environmental Protection Zones🔗

1. Throughout the entire territory of the country, including in the territories of settlements, for the purpose of protecting cultural heritage and the environment, it is possible to designate specific cultural heritage and environmental protection zones, which are reflected in legal zoning documents.

2. In the general land use plan, cultural heritage and environmental protection zones are reflected as a legal zoning document.

3. For the purpose of implementing legal zoning documents, the following main types of zones are established:

a) cultural heritage protection zones;

b) environmental protection zones.

4. Cultural heritage protection zones include the following, which are defined by the Law of Georgia “On Cultural Heritage”:

a) individual (physical) protection zone (area) of a monument;

b) visual protection zone (area) of a monument;

c) protection zone of historical built-up area;

d) regulation zone of historical built-up area;

e) protection zone of historical landscape;

f) archaeological protection zone.

5. Environmental protection zones are:

a) environmental protection zone 1 (EPZ-1):

a.a) protected area of a natural monument;

a.b) protection of the natural monument and its territory is carried out;

a.c) construction activity in the protected area of a natural monument is carried out only for the purpose of its protection and/or visual perception.

b) environmental protection zone 2 (EPZ-2):

b.a) protected landscape territory;

b.b) protection and restoration of the protected landscape territory is carried out, without disturbing the visual aspect of the protected landscape;

b.c) construction activity in the protected landscape territory is permitted only for the purpose of its protection, restoration, the justified need of the local population and the creation of appropriate tourist infrastructure, without disturbing the visual aspect of the protected landscape;

c) environmental protection zone 3 (EPZ-3):

c.a) water protection territory;

c.b) protection and restoration of the water protection territory is carried out;

c.c) construction activity in the water protection territory is carried out only for the purpose of its protection and/or restoration.

Article 14. Conditions for Changing Existing Zones🔗

1. A change to existing zones constitutes a change in urban planning documents and, accordingly, requires passing the same procedures as are established by the "Basic Provisions for the Regulation of the Use and Development of Settlement Territories" for their approval. The exception is the cases defined in paragraphs 2 and 3 of this article.

2. In the cases defined in this paragraph, existing general functional zones shall be changed in accordance with the rules of simplified administrative proceedings established by Chapter VI of the General Administrative Code:

a) the change of all existing functional zones defined by this Chapter into a landscape-recreational zone;

b) the change of all existing functional zones defined by this Chapter, except for a landscape-recreational zone, into a recreational zone;

c) the change of industrial zone 1, public-business and residential zones defined by this Chapter into an agricultural zone;

d) the change of industrial and public-business zones into a residential or transport zone.

3. In the cases defined in this paragraph, existing specific functional zones shall be changed in accordance with the rules of simplified administrative proceedings established by Chapter VI of the General Administrative Code:

a) the change of industrial zone 2 (S-2) into industrial zone 1 (S-1);

b) the change of public-business zone 2 (SSZ-2) into public-business zone 1 (SSZ-1);

c) the change of residential zone 6 (SZ-6) into any other residential zone, except for residential zone 4 (SZ-4) and residential zone 1 (SZ-1);

d) the change of residential zone 5 (SZ-5) into residential zone 3 (SZ-3) and residential zone 2 (SZ-2);

e) the change of residential zone 3 (SZ-3) into residential zone 2 (SZ-2).

Article 15. Determination of the conditions for the use and development of individual land plots during the transitional period of implementation of specific legal zoning of land use🔗

1. During the transitional period, when specific land plot(s) do not fall within the boundaries of the documents of specific legal zoning of land use of the territories of settlements, then the development of the specific land plot(s) for the purpose of construction activity shall be carried out:

a) in accordance with the existing situation obtained on the basis of a study of a territory regulated from the planning perspective of the territories of settlements (e.g., a block), in the case when the land plot(s) constitute a part of such a block;

b) in accordance with the existing situation obtained on the basis of a study of the territory located within 50 metres around the perimeter of the land plot(s), in the case when the land plot(s) constitute a part of unregulated/unorderly development (the territory within 50 metres around the perimeter of the land plot(s) means all land plots that are in contact with the territory within 50 metres around the perimeter of this land plot(s)).

2. The study of the existing development in the territory adjacent to the specific land plot(s) determined by paragraph 1 of this Article includes:

a) if necessary, aerial photography of the territory to be studied;

b) topographic plan of the territory to be studied;

c) a map of the distribution of land plots in the territory to be studied (showing the number and area of the land plot);

d) development coefficients of land plots in the territory to be studied;

e) development intensity coefficients of land plots in the territory to be studied;

f) landscaping coefficients of land plots in the territory to be studied;

g) data on the legal acts, legal regimes and subordinate normative acts existing in the territory to be studied, which may have an impact on the development of the specific land plot(s) for the purpose of construction activity.

3. On the basis of the study of the existing development of the territory around the specific land plot(s) determined by paragraph 1 of this Article, the administrative body issuing the construction permit shall adopt a decision on the conditions for the use of such land plot(s) for construction, which shall be close to the results of the study.

4. The relevant body of local self-government shall not have the right to oblige the owner(s) of the relevant land plot(s) to study the territory adjacent to the specific land plot(s) determined by paragraph 1 of this Article, if they do not have a request for the development of the specific land plot(s) for the purpose of construction activity.

Article 16. Commission on Issues of Regulation of the Use and Development of Settlement Territories. Its rights and duties🔗

1. For the purpose of further improvement and effective functioning of the regulation of the use and development of settlement territories, by decision of the Sakrebulo, in agreement with self-government bodies, it is possible to establish a “Commission on Issues of Regulation of the Use and Development of Settlement Territories” (hereinafter – the Commission), which is subordinate to the executive body of the relevant self-government.

2. The scope of the Commission’s competences may include:

a) preparation of regular reports for Sakrebulos on issues of regulation of the use and development of settlement territories and provision of consultations;

b) organization, together with the relevant service of the self-government body, of public information work and discussions for the purpose of publicity of the processes of elaboration, consideration and approval of urban planning documents;

c) consideration of proposals, comments and complaints on issues of regulation of the use and development of settlement territories;

d) preparation of self-government decisions on the issuance of planning assignments for urban planning documents;

e) preparation, together with the relevant service of the self-government body, of Sakrebulo decisions for the approval of maps of legal zoning of land use;

f) preparation of self-government decisions on the approval of urban planning documents or their parts;

g) preparation of a Sakrebulo decision for a special zonal agreement.

3. If the Commission exists, its function and rights and duties shall be determined by a regulation approved by the Sakrebulo.

Article 17. Special zoning agreement🔗

1. A special zoning agreement provides for an increase in the value of the K-2 coefficient determined for a specific land plot.

2. A special zoning agreement is permissible on construction land plots of built-up territories, including:

a) in a residential zone;

b) in a public-business zone.

3. In a residential zone, under a special zoning agreement, an increase of the existing K-2 coefficient by a maximum of 10% is permissible.

4. In a public-business zone, under a special zoning agreement, an increase of the existing K-2 coefficient by a maximum of 20% is permissible.

5. In the event that the permit applicant wishes to increase the value of the K-2 coefficient, he shall, in the application for acceptance of the conditions for the construction use of the land plot(s), state the request for the adoption of a special zoning agreement.

6. A decision on a special zoning agreement is made at the first stage of issuing a construction permit.

7. In the event that the 30-day period is insufficient for making a decision on a special zoning agreement, the period of administrative proceedings shall be extended in accordance with the established procedure.

8. The fee for a special zoning agreement is determined by the Law of Georgia "On Local Fees".

9. For recreational territories and zones of special construction regulation (except for the cities of Tbilisi and Batumi), in order to adopt a special zoning agreement, the authorized body of local self-government, in accordance with the established procedure, sends a request, together with other documents, to the Ministry of Economic Development of Georgia, which, in accordance with the procedure determined for another administrative body, makes a decision on the special zoning agreement and sends it to the authorized body of local self-government.

10. The authority to approve a decision on a special zoning agreement is vested in the relevant body of local self-government.

Article 18. Non-compliance with the requirements of this Chapter and conditional (forced) non-compliance🔗

1. Land plots and buildings that do not comply with the requirements of this Chapter are assigned the status of non-compliant land plots and buildings, which is assigned by the executive body of local self-government.

2. Land plots and buildings which, by their characteristics, do not comply with the development regulation requirements of the relevant zone and for which compliance cannot be ensured, are assigned the status of conditionally (forced) non-compliant land plots and buildings.

3. Further development (expansion of the territory, change of function, reconstruction) of land plots and buildings having non-compliant and conditionally (forced) non-compliant status is carried out only subject to the elimination or reduction of the non-compliance. The conditions of reduction may be determined in stages, with the aim of final elimination.

4. In the case of elimination of the non-compliance, the non-compliant status is removed from land plots and buildings having non-compliant status.

Chapter IIIComposition of the General Land Use Plan and the Development Regulation Plan

Article 19. Composition of the general land use plan🔗

1. The basis for the elaboration of the general land use plan is legislation, including the Law of Georgia “On the Fundamentals of Spatial Planning and Urban Development” and the planning assignment for the general land use plan issued in accordance with the procedure established by legislation.

2. The general land use plan comprises:

a) a textual part;

b) a zoning part;

c) an engineering part;

d) a thematic part.

3. The textual part comprises:

a) a description of the general land use plan;

b) an explanatory note to the general land use plan;

c) an assessment of the effectiveness (benefit) of the general land use plan;

d) the stages and sequence of implementation of the general land use plan.

4. The zoning part constitutes the general legal zoning of land use of the project territory, which comprises:

a) general recommended data on land use intensity;

b) the location of the territory in the existing urban development context, communication and transport lines.

5. The engineering part, depending on the planning assignment, may comprise:

a) a map of the main water supply and domestic sewerage networks in the project territory;

b) a map of the main electricity supply network in the project territory;

c) a map of the main natural gas supply network in the project territory;

d) a map of the main drainage sewerage network in the project territory;

e) a map of the main road and street network in the project territory.

6. The thematic part, depending on the planning assignment, may comprise, for example: a tourism development system, a protected areas system, a cultural heritage system, a recreational areas system, a service centres system and other thematic issues.

Article 20. Pre-design study for the development of the planning assignment of the General Plan of Land Use🔗

1. For the development of the planning assignment of the General Plan of Land Use, a pre-design study is required in accordance with this Article.

2. The pre-design study includes:

a) study of the physical environment;

b) documentary study;

c) technical-economic justification.

3. The study of the physical environment includes:

a) an orthophoto image of the project territory in its existing condition;

b) a topographic-geodetic map of the project territory;

c) general geological and seismic data of the project territory;

d) general climatic data of the project territory (natural precipitation, wind, solar radiation);

e) data on the existing natural values of the project territory;

f) data on the immovable monuments of cultural heritage existing in the project territory;

g) existing ecological data of the project territory;

h) the main network of water supply and domestic sewerage existing in the project territory;

i) the main electricity supply network existing in the project territory;

j) the main natural gas supply network existing in the project territory;

k) the main drainage sewerage network existing in the project territory;

l) the network of main through roads and streets existing in the project territory;

m) data on the owners of land plots existing in the project territory.

4. The documentary study includes data on the existing urban planning documents, legal acts, legal regimes and subordinate normative acts in the project territory, necessary for its planning, and related analytical and scientific materials.

5. The technical-economic justification includes the main goals and tasks of the project territory and the feasibility of planning.

6. The development of the planning assignment of the General Plan of Land Use is carried out using the data from the list defined by this Article that are necessary for the planning tasks. Also, for the planning tasks, other additional data for the pre-design study may be determined.

Article 21. Composition of the Development Regulation Plan🔗

1. The basis for the development of the Development Regulation Plan is legislation, including the Law of Georgia “On the Fundamentals of Spatial Planning and Urban Development”; if available, the general land use plan and the planning assignment for the Development Regulation Plan issued in accordance with the procedure established by legislation.

2. The Development Regulation Plan is developed only for a territory of 2000 m² (0.2 ha) and more.

3. The Development Regulation Plan includes:

a) zoning part;

b) engineering part;

c) textual part;

d) thematic part.

4. The zoning part constitutes the specific legal zoning of land use of the project territory, which may include:

a) land plot development coefficients;

b) land plot development intensity coefficients;

c) land plot greening coefficients;

d) a map of the distribution of land plots in the project territory (showing the land plot number and area);

e) development regulation lines (red lines);

f) mandatory development lines (blue lines);

g) schemes for the placement of buildings on land plots.

5. The engineering part may include:

a) a map of the main and local water supply and domestic sewerage networks in the project territory, indicating the capacities allocated for specific land plots;

b) a map of the main and local electricity supply networks in the project territory, indicating the capacities allocated for specific land plots;

c) a map of the main and local natural gas supply networks in the project territory, indicating the capacities allocated for specific land plots;

d) a map of the main and local drainage sewerage networks in the project territory, indicating the capacities allocated for specific land plots;

e) a map of the main and local road and street networks in the project territory.

6. The textual part includes:

a) description of the Development Regulation Plan;

b) explanatory note of the Development Regulation Plan;

c) assessment of the effectiveness (benefit) of the Development Regulation Plan;

d) stages and sequence of implementation of the Development Regulation Plan.

7. In the protection and regulation zones of historical development, the Development Regulation Plan, in addition to the requirements established by this article, shall additionally include the following parts:

a) requirements for the protection and rehabilitation of cultural heritage.

a.a) requirements for intervention in rehabilitation objects (monuments and other cultural heritage objects, background development, public space);

b) requirements for the development of territories and new construction:

b.a) identification of conservation and development areas (indicating buildings to be demolished and to be preserved);

b.b) permissible parameters of new construction (scale, height, spatial and planning configuration, rhythm of facades, fenestration);

b.c) requirements for the improvement of public space.

8. The thematic part, based on the planning assignment, may include thematic issues.

Article 22. Pre-design study for the elaboration of the planning assignment of the development regulation plan🔗

1. A pre-design study is required for the elaboration of the planning assignment of the development regulation plan.

2. The pre-design study includes:

a) study of the physical environment;

b) documentary study;

c) technical-economic justification.

3. The study of the physical environment includes:

a) an orthophoto of the project territory in its existing condition;

b) a topographic-geodetic map of the project territory;

c) general geological and seismic data of the project territory;

d) general climatic data (atmospheric precipitation, wind, solar radiation) of the project territory;

e) data on the existing natural values of the project territory;

f) data on the immovable monuments of cultural heritage existing on the project territory;

g) the existing ecological data of the project territory;

h) the main and local networks of water supply and domestic sewerage existing on the project territory;

i) the main and local networks of electricity supply existing on the project territory;

j) the main and local networks of natural gas supply existing on the project territory;

k) the main and local networks of drainage sewerage existing on the project territory;

l) the main and local networks of roads and streets existing on the project territory;

m) data on the owners of the land plots existing on the project territory.

4. The documentary study includes data on the legal acts of the existing urban planning documents, legal regimes and subordinate normative acts necessary for the planning of the project territory, and related analytical and scientific materials.

5. The technical-economic justification includes the main goals, tasks and the expediency of planning of the project territory.

6. In the zones of protection of historical development and of regulation of development, the basis for the elaboration of the planning assignment of the development regulation plan is the historical-cultural reference plan, which includes informational and analytical material reflecting the cultural heritage protection zones and the monuments therein, and the historically formed environment.

7. The elaboration of the planning assignment of the development regulation plan is carried out with the data from the list defined by this article that are necessary for the planning tasks. Also, for the planning tasks, other additional data for the pre-design study may be determined.

Chapter IVFormation of the goals, elaboration and approval of the documents of spatial-territorial planning of settlements, introduction of amendments thereto and publicity of these processes

Article 23. Procedure for approval of spatial-territorial planning documents of settlements🔗

1. The procedure for approval of the spatial-territorial planning documents of settlements shall be carried out in two stages, each of which involves independent administrative proceedings. Only after the completion of the administrative proceedings provided for by the first stage and the issuance of a positive administrative-legal act may the administrative proceedings of the subsequent stage be commenced. The time limits for the administrative proceedings of the said stages are:

a) Stage I – approval of the planning assignment for the spatial-territorial planning documents of settlements, in accordance with the rules of simplified administrative proceedings established by Chapter VI of the General Administrative Code of Georgia – no more than 20 days;

b) Stage II – approval of the spatial-territorial planning documents of settlements, in accordance with the rules of public administrative proceedings established by Chapter IX of the General Administrative Code of Georgia – no more than 30 days.

2. Both stages of the administrative proceedings related to the approval of the spatial-territorial planning documents of settlements shall be conducted by the relevant executive body of the relevant self-government, while the administrative-legal acts shall be issued by the Sakrebulo:

a) Stage I – an administrative-legal act on approval of the planning assignment for the spatial-territorial planning documents of settlements;

b) Stage II – an administrative-legal act on approval of the spatial-territorial planning documents of settlements.

3. Administrative-legal acts related to the approval of the spatial-territorial planning documents of settlements shall comply with the requirements established for an administrative act by Chapter IV of the General Administrative Code of Georgia.

4. An urban planning document that covers a cultural heritage protection zone/zones shall be approved by the relevant body in agreement with the Ministry of Culture, Monuments Protection and Sport of Georgia, in accordance with the procedure established by legislation.

5. Amendments to the general land use plan and the development regulation plan shall be made in compliance with the procedures defined by this Article, except for the cases defined by Article 14 of this provision.

6. Before the commencement of the administrative procedures for approval of the spatial-territorial planning documents of settlements, the relevant executive body of the relevant self-government shall ensure the implementation of the following measures:

a) In the case of elaboration of a general land use plan and in the case of elaboration of a development regulation plan, when there is no general land use plan for the territory to be planned:

a.a) Presentation of the proposed ideas and goals for the development of the territory to be planned;

a.b) Determination of the period for receiving opinions/evaluations from interested and third parties regarding the proposed ideas and goals for the development of the territory to be planned;

a.c) Conducting a pre-project study for the territory to be planned;

a.d) Development of the draft planning assignment of the General Land Use Plan.

b) When developing the Development Regulation Plan, in the case where the territory to be planned falls within the boundaries of the respective General Land Use Plan, if necessary:

b.a) Presentation of the anticipated considerations and goals for the development of the territory to be planned;

b.b) Determination of the period for receiving opinions/assessments from interested and third parties regarding the anticipated considerations and goals for the development of the territory to be planned;

b.c) Conducting a pre-project study for the territory to be planned.

Article 24. Publicity of the process of formation, elaboration and consideration of the goals of spatial-territorial planning documents of settlements🔗

1. Publicity of the process of formation, elaboration and consideration of the goals of spatial-territorial planning documents of settlements, in addition to the requirements defined by the Law of Georgia “On the Fundamentals of Spatial Arrangement and Urban Planning”, shall be additionally ensured in accordance with paragraphs 2, 3 and 4 of this Article.

2. In the case of the elaboration of a general land use plan, by placing an information board in a visible place in front of the administrative building of the relevant self-government Sakrebulo and the following information on it:

a) information on the customer (orderer) of the general land use plan;

b) information on the administrative body approving the general land use plan;

c) information on the boundaries of the territory to be planned and the approximate views and goals of their development;

d) the period for receiving views/assessments from interested and third parties on the approximate views and goals of the development of the general land use plan;

e) the procurement deadlines for conducting the pre-project study for the elaboration of the general land use plan;

f) the deadlines of the administrative proceedings for the consideration and approval of the planning assignment of the general land use plan;

g) the procurement deadlines for the elaboration of the general land use plan;

h) the approximate and subsequently specified deadlines of the administrative proceedings for the consideration and approval of the general land use plan.

3. When elaborating a development regulation plan, in the case where the territory to be planned falls within the boundaries of the relevant general land use plan, by placing an information board in a visible place on the territory to be planned and the following information on it:

a) information on the customer (orderer) of the development regulation plan;

b) information on the administrative body approving the development regulation plan;

c) information on the boundaries of the territory to be planned;

d) where necessary, the deadlines for conducting the pre-project study;

e) the deadlines of the administrative proceedings for the consideration and approval of the planning assignment of the development regulation plan;

f) the deadlines for the elaboration of the development regulation plan;

g) the approximate and subsequently specified deadlines of the administrative proceedings for the consideration and approval of the development regulation plan.

4. When elaborating a development regulation plan, in the case where there is no general land use plan for the territory to be planned, by placing an information board in a visible place on the territory to be planned and the following information on it:

a) information on the customer (orderer) of the development regulation plan;

b) information on the administrative body approving the development regulation plan;

c) information on the boundaries of the territory to be planned and the approximate views and goals of their development;

d) the period for receiving opinions/assessments from interested and third parties on the estimated considerations and objectives of the development of the development regulation plan;

e) where necessary, the timeframes for conducting a pre-design study;

f) the timeframes of the administrative proceedings for the review and issuance of the planning assignment of the development regulation plan;

g) the timeframes for the elaboration of the development regulation plan;

h) the estimated and subsequently specified timeframes of the administrative proceedings for the review and approval of the development regulation plan.

5. In the event of amendments to the general land use plan and the development regulation plan, the respective requirements of this Article shall be observed.

Chapter VConditions for the placement of buildings and structures on land plot(s), determination of their maximum heights and the encroachment of their parts onto/into public territory/space

Article 25. Conditions for the placement of buildings on land plot(s) and determination of their maximum heights🔗

1. The purpose of determining the conditions for the placement of buildings on land plot(s) and their maximum heights is:

a) establishment of the conditions for the placement of buildings on land plot(s);

b) determination of the interdependence between the maximum permissible height(s) of buildings on land plot(s) and the distances from these building(s) to the neighbourhood boundaries of adjacent land plots;

c) determination of the interdependence between the maximum permissible height(s) of buildings on land plot(s) and adjacent streets and/or other public spaces.

2. The conditions established by this rule for the placement of buildings on land plot(s) and determination of their maximum heights shall apply if the development regulation plans do not establish a different regulation for specific land plots in the cultural heritage protection zones of settlements:

a) of the conditions for the placement of buildings on land plot(s);

b) of the interdependence between the maximum permissible height(s) of buildings on land plot(s) and the distances from these building(s) to the neighbourhood boundaries of adjacent land plots;

c) of the interdependence between the maximum permissible height(s) of buildings on land plot(s) and adjacent streets and/or other public spaces.

3. For the public-business zone, by the development regulation plan, and for special construction regulation zones, by the respective regulation, it is also possible to establish different values of Y as defined by paragraph 2 of Article 27 of this Chapter.

4. The requirements of this Chapter shall not apply to structures, including:

a) masts and towers;

b) airport, seaport and railway structures;

c) aerial cableway structures;

d) hydro, thermal and nuclear power plants; also electrical substations;

e) oil, petroleum products and liquid gas storage facilities, terminals;

f) shore protection, linear and other special-purpose engineering structures;

g) monuments.

5. The conditions for the placement of the objects provided for by paragraph 4 of this Article and their maximum heights shall be determined on the basis of other normative acts, if such exist.

6. The body issuing the construction permit shall act according to the following principle – if buildings were constructed before the entry into force of the present "Basic Provisions of Development", in non-compliance with the requirements of this Chapter, during their reconstruction it is inadmissible to further increase the degree of the existing non-compliance with the requirements of this Chapter. All possibilities shall be used to reduce it.

7. For those objects in respect of which the procedure for issuing a construction permit was commenced before the entry into force of the present "Basic Provisions of Development", the regulation in force at the moment of submission of the application shall apply.

8. When placing buildings on land plot(s) and determining their maximum heights, when a specific issue is regulated by several norms that do not contradict each other but impose different conditions, in such a case the requirements of all relevant norms shall be satisfied.

Article 26. Placement of buildings on a construction land plot🔗

1. For the purposes of this Chapter, the boundary (cadastral boundary) of a construction land plot is of 2 types:

a) the public boundary of a construction land plot – when the construction land plot borders a street and/or another public space (except for a dead-end street);

b) the neighbouring boundary of a construction land plot – when the construction land plot borders a construction land plot, or a non-construction land plot that does not constitute a public space.

2. The boundary zone constitutes that part of the construction land plot which is located at a distance of less than 3.0 metres from the neighbouring boundaries of the land plot.

3. On a construction land plot, in accordance with paragraphs 4 and 5 of this article, for the purpose of determining the rear yard of the construction land plot, development regulation line(s) (red line(s)i) shall be established.

4. In the case where a construction land plot borders a street or another public space on only one side, then the red line(s) shall be established at a distance of 3.0 metres from the neighbouring boundary(ies) opposite (non-bordering) the public boundary.

5. In the case where a construction land plot borders two intersecting streets or another public space, then the red line(s) shall be established at a distance of 3.0 metres from the neighbouring boundary(ies) opposite (non-bordering) the public boundaries up to their intersection.

6. For the purposes of this Chapter, two adjacent (intersecting) boundaries of the land plot boundary that form an angle of 160 to 180 degrees with each other constitute one side of the land plot boundary.

7. If, due to the contour of the cadastral boundary of the construction land plot, it is not possible to distinguish the neighbouring boundary opposite (non-bordering) the public boundary of this land plot and, consequently, it is not possible to establish the red line(s) for determining the rear yard of the construction land plot, then the placement of a building on the land plot shall be carried out in accordance with paragraph 24 of this article.

8. That part (area) of the construction land plot which is situated between the neighbouring boundary/boundaries opposite (non-bordering) the public boundary(ies) and the red line(s) established in accordance with this article is part of the boundary zone, which, for the purposes of placing buildings on the construction land plot, is called the rear yard of the construction land plot.

9. In the case where a construction land plot has public boundaries opposite (non-bordering) each other and/or a neighbouring boundary on only one side, then, for the placement of a building on it, the rear yard on the construction land plot shall not be determined.

10. All those calculated surfaces of a building that form an angle from zero to 45 degrees inclusive with the imaginary vertical plane of the boundary shall be considered as located on the side of the respective boundary.

11. The placement of a building or part thereof on the territory of the rear yard of a construction land plot is inadmissible; the conditions defined by paragraph 12 of this article constitute an exception.

12. It shall be permissible to place a building or part thereof on the rear yard area of a construction land plot where a building is placed on the rear yard area of the construction land plot adjacent to that construction land plot, in such a way that the requirements of this Article are observed with respect to the other bordering construction land plot(s) on whose rear yard area no building is placed.

13. A building or part thereof that is located at a distance of less than 3.0 metres from the neighbourhood boundary shall be considered to be placed in the boundary zone of a construction land plot.

14. The placement of the reference surface of a building or part thereof in the boundary zone of a construction land plot shall be permissible without a door, window, vent and other open part in the wall, as well as a balcony, bay window and terrace, on the side of the neighbourhood boundary. This condition shall not apply to those parts of the building which are placed on the side of the public boundary and to the cases defined by paragraphs 15, 16 and 19 of this Article.

15. In the boundary zone of a construction land plot, a door, window, vent and other open part in the wall, as well as a balcony and bay window, may be arranged on a building if the reference surface of the building (on which such parts are located) forms an angle of 75 to 90 degrees with the vertical imaginary plane of the neighbourhood boundary and is located at a distance of not less than 0.6 metres from the neighbourhood boundary.

16. Where there is a fire-resistant blank common fence on the neighbourhood boundary or, within the land plot, in the boundary zone, a fire-resistant blank fence, it shall be possible to arrange a window, door or other open parts in the wall of a building located in the boundary zone, provided that their upper mark is 0.6 m below the upper mark of the fence. In the event of the dismantling of such a wall, if it has not been restored within a reasonable time, the open parts existing in the boundary zone shall be filled with non-combustible construction material.

17. The height of the arrangement on the reference surface of a door, window, vent and other open part in the wall on the side of the neighbourhood boundary of a building depends on the perpendicular distance between the reference surface of the building on the side of the neighbourhood boundary and the imaginary vertical plane of the neighbourhood boundary, in accordance with the list given below:

a) in the case of a distance of 3.0 m – at a height of up to 7.5 m;

b) in the case of a distance of from 3.0 m to 10 m – in accordance with the following ratio of the following formula: the distance divided by 0.4;

c) in the case of a distance of more than 10 m – up to the maximum height of the reference surface.

18. At a distance of up to 5.0 metres from the neighbourhood boundary, the use of combustible construction materials for the structure and cladding of a part of a building shall be inadmissible. The said condition shall also apply to that part of the building which is placed on the side of the public boundary, where the width of the street is less than 5.0 m.

19. In the event that, on the reference surface of a building or a part thereof, a door, a window and another open part existing in the wall are arranged in compliance with the requirements of this Article, then, in the distance between the neighbouring boundary and the two nearest points of the building, no account shall be taken of such parts of the building protruding towards the neighbouring boundary by up to 1.2 metres as: a balcony, an oriel, the entrance stair(s) to the building, their roofings and other similar architectural-constructional parts; at the same time, the distance from the edge of these parts to the neighbouring boundary shall be not less than 1.8 metres. In the event that the protrusion of such architectural-constructional parts is more than 1.2 metres, then the distance of the building to the neighbouring boundary shall be determined by the distance between the imaginary vertical plane of the neighbouring boundary and the nearest points of these parts.

20. On a construction land plot, in the boundary zone, in compliance with fire safety requirements, the following shall also be permissible:

a) the placement of an auxiliary building-structure (e.g.: the arrangement of entrance stairs and ramps of a building-structure and their roofing for the purpose of protecting them from precipitation, parking lots, terraces, open playgrounds for children, a storage room for inventory, a shed, agricultural-purpose premises, including shelters for domestic animals and poultry, in those zones of settlements where such are permitted, and other similar types of building-structures), the height of which from the ground surface does not exceed 3.5 metres, and in the case of a pitched roof, 5.0 metres to the ridge;

b) the placement of such auxiliary building-structures as defined by subparagraph „a“ of this paragraph, the height of which from the ground surface to the ridge exceeds 5.0 metres. In this case, the conditions established by this rule for the placement of buildings on land plot(s) and the determination of their maximum heights shall apply to them.

21. A construction land plot does not have a public boundary when it is connected to a street and/or other public space only by a dead-end or an access way.

22. In the event that a construction land plot does not have a public boundary, then, for the placement of a building on the construction land plot in accordance with paragraph 2 of this Article, in the established boundary zone the requirements defined by this Article for the rear yard of a construction land plot shall apply, or the placement of a building on the construction land plot shall be carried out in accordance with paragraph 24 of this Article.

23. A door, a window, a vent and another open part existing in the wall, arranged on the side of the neighbouring boundary on a building constructed in the neighbouring boundary zone, may not be used as an obstacle when constructing new building(s) on the adjacent land plot in the boundary zone in compliance with the requirements of this Chapter.

24. In the event that a specific land plot does not afford the possibility of placing buildings in compliance with the requirements of this Chapter, then they (the buildings) shall be placed on the basis of a „Scheme of Placement of Buildings on a Land Plot“, which shall be agreed with the owners of the adjacent land plots and reflected by the body issuing the construction permit in the urban planning conditions.

25. When a building is placed on a land plot, a building that has an independently functioning foundation structural system shall be considered one building.

Article 27. Determination of the Maximum Height of a Building Placed on a Construction Land Plot🔗

1. The maximum permissible height of a building on a construction land plot shall be determined from the side of its rear yard and public boundary(ies).

2. The maximum permissible height of a building on a construction land plot shall be determined by the formula H=L/Y, where:

a) L represents:

a.a) the perpendicular distance from the line of contact of the design surface of the building located on the side of the public boundary (street) of the construction land plot with the ground surface to an imaginary vertical plane at half the width of the street;

a.b) the perpendicular distance from the line of contact of the design surface of the building located on the side of the public boundary of the construction land plot with the ground surface to an imaginary vertical plane at half the distance to the opposite boundary (edge) of the public space; in the case where the land plot directly borders a public space or a street that on the other side borders a public space;

a.c) the perpendicular distance from the line of contact of the design surface of the building located on the side of the rear yard of the construction land plot with the ground surface to an imaginary vertical plane of the neighbourhood boundary;

a.d) in the case where the design surface of the building does not constitute a plane, then on the side of the corresponding boundary L shall be determined from the nearest point of the building to the imaginary vertical plane of the boundary, respectively, or to the imaginary vertical plane at half the width of the street, or to the imaginary vertical plane at half the distance to the opposite boundary (edge) of the public space;

a.e.) The maximum design value of L in residential zones is equal to 20 m, except for zones SZ-1 and SZ-2, where the maximum design value of L is equal to 6 m. When determining L, a building or structure built in violation of legislation shall not be taken into account.

b) Y represents a coefficient whose value is:

b.a) 0.35 for public-business and special construction regulation zones of settlements;

b.b) 0.25 for industrial zones;

b.c) 0.4 for all other zones.

c) H – the design height of the building facade.

3. When a construction land plot is bordered on more than one side by intersecting streets or another public space, the design height of the building facade shall be calculated from the side of the wider street or public space. This height indicator shall also apply to the part of the design surface (facade) of the building located on the narrower street that does not exceed the length of the design surface (facade) facing the wider street, but not more than 20 metres. For the remaining part of the design surface (facade) located on the narrower street, the maximum permissible height shall be determined from the side of its bordering street or other public space.

4. Where a land plot has public boundaries that are opposite (non-adjacent) to each other, the maximum height of a building located thereon shall be determined separately from such opposite public boundaries, from the side of the street or other public space adjacent thereto.

5. Where a building land plot is located within the area of operation of a public-business zone and is bordered on more than one side by a street or other public space, the maximum height of the building from the sides of the public boundaries shall be determined from the wider street or other public space bordering such land plot.

6. Where a building land plot is located within the area of operation of a public-business zone and the perpendicular distance between the reference surface located on the rear yard side of the building placed thereon and the imaginary vertical plane of the neighbourhood boundary exceeds 10 metres, the maximum height of the building shall be determined from the side of the public boundary(ies) of the building land plot.

7. When determining the reference heights of buildings, in the case of a pitched roof, the height of the building facade includes the height of the wall up to the reference edge of the roof, plus:

a) from the side of the slope:

a.a) the height from the reference edge of the roof to the ridge, where the angle of inclination (sum of angles) of the roof plane(s) relative to the horizontal plane of the reference surface exceeds 70 degrees;

a.b) one third of the height from the reference edge of the roof to the ridge, if the angle of inclination (sum of angles) of the roof plane(s) relative to the horizontal plane of the reference surface is from 45 degrees to 70 degrees inclusive.

b) from the side of the gable:

b.a) the height from the reference edge of the roof to the ridge, where the sum of the angles of inclination of the roof planes relative to the horizontal plane of the reference surface is more than 140 degrees;

b.b) one third of the height from the reference edge of the roof to the ridge, if the sum of the angles of inclination of the roof planes relative to the horizontal plane of the reference surface is from 90 degrees to 140 degrees inclusive.

Article 28. Placement of buildings on a single building land plot and determination of their maximum heights🔗

1. The requirements of this Chapter shall also apply in the case of placement of several different buildings on a single building land plot.

2. In the case of placement of several different buildings on a single building land plot, the requirements determined by this Chapter shall be implemented on the same building land plot on the basis of establishing imaginary neighbourhood boundary(ies) (that is, more than one different building must be placed on a single building land plot in the same manner as different building land plots adjacent to each other are placed in relation to one another in accordance with the requirements of this Chapter).

Article 29. Encroachment of parts of a building and architectural details located on a construction land plot into a public territory/space that does not require agreement with the owner of the public territory/space🔗

1. The requirements of this Article apply to encroachment of parts of a building and architectural details located on a construction land plot into public spaces that does not require agreement with the owner of the public territory/space.

2. It shall be inadmissible for parts of a building and architectural details located on a construction land plot to encroach into a street or other public territory/space at a height of up to 4.5 m from the ground surface:

a) encroachment of balconies and bay windows by more than 0.3 m;

b) any encroachment of other architectural details by more than 0.3 m;

c) encroachment of window sashes/shutters (in the fully open position) by a distance of more than 0.6 m, but the perpendicular distance from the vertical imaginary plane of the edge of the pavement shall be at least 0.8 m;

3. It shall be inadmissible for parts of a building and architectural details located on a construction land plot to encroach into a street or other public space at a height of more than 4.5 m from the ground surface:

a) encroachment of balconies and bay windows by more than 1.4 m;

b) approach of balconies and bay windows to the vertical imaginary plane of the edge of the pavement by more than 0.8 m;

c) any projection of the architectural details of the facade by more than 0.3 m;

d) any projection of the finishing cornices of the building and the architectural details of the roof by more than 1.0 m.

4. It shall be inadmissible for parts of a building/structure located on a construction land plot to encroach into a street or other public space below the ground surface by more than 0.3 m.

5. The water outlet of the rainwater gutters of a building shall not encroach into a public space at a height of more than 0.3 m from the plane of the street pavement, and shall not encroach on the side of the street or other public space at a distance of more than 0.3 m from the public boundary onto the pavement, when it is located above the ground surface.

6. Signs and signboards attached to a building may encroach into a public space at a height above 2.5 m from the ground surface, but the perpendicular distance from the vertical imaginary plane of the edge of the pavement to these signs and signboards shall be at least 0.8 m.

7. A construction land plot bordering a street and/or other public space that do not have a pavement adjacent to this land plot — in such a case, it shall be inadmissible for parts of a building and architectural details to encroach from this land plot towards the street and/or public space beyond the public boundary by more than 0.3 m.

8. A land plot bordering a street that constitutes only a pavement — in such a case, it shall be inadmissible from this land plot:

a) encroachment of parts of a building and architectural details into the street and/or public space by more than 0.3 m, when such street is 3.0 m or less;

b) parts of a building and architectural details on the side of the street and/or public space, at a height of up to 4.5 m from the point of intersection of the building/structure and the pavement, encroachment into the public space by more than 0.3 m, when such street is more than 3.0 m;

c) encroachment of parts of a building and architectural details into the street and/or other public space at a height of more than 4.5 m from the point of intersection of the building and the pavement, beyond the public boundary by more than 0.5 m, when such street is more than 3.0 m.

Article 30. Such encroachment of parts of a building and architectural details located on a construction land plot into public territories/spaces as requires agreement with the owner of the public space🔗

1. The requirements of this Article apply to such encroachment of parts of a building and architectural details located on a construction land plot into public spaces as requires agreement with the owner of the public space (the relevant authorised body of local self-government) and the acquisition, on the basis of a contract, of the right to use the public territory/space.

2. It is permissible to arrange entrance stairs in a building located on a construction land plot from the ground surface up to such ground floor whose floor surface is located above the ground surface or up to the first above-ground floor, but not more than 4.5 metres in height, and the perpendicular distance from the vertical imaginary plane of the pavement edge to these stairs shall be at least 1.8 metres.

3. It is permissible to arrange stairs leading down into a building/structure located on a construction land plot and natural lighting to a depth of 2.7 metres from the ground surface, however the perpendicular distance from the vertical imaginary plane of the pavement edge to these stairs shall be at least 1.8 metres.

4. It is permissible for parts of a building and architectural details located on a construction land plot to encroach into the street or other public territory/space at a height of 2.7 m to 4.5 m from the ground surface as roofing structures, sheds, tents, awnings and other architectural parts of a similar type, but the perpendicular distance from the vertical imaginary plane of the pavement edge to such architectural parts shall be at least 0.6 metres. Where necessary, it is possible to arrange supporting columns in such a way as not to impede the functioning of the pavement.

5. The conditions defined by this Article may be applied only in those public territories/spaces where they are permitted by the relevant executive body of the self-government.

Article 31. Placement of a common wall/fence on the boundary between neighbouring plots🔗

1. On the boundary between neighbouring plots, a common wall/fence shall be placed on the basis of mutual agreement of the owners of the respective adjoining land plots.

2. A common wall/fence shall be built in such a way that, by its load-bearing capacity, in the case of the construction of blocked (paired) buildings of different heights, it satisfies the requirements of the neighbours.

3. The width of the common wall/fence shall be distributed equally from the boundary between neighbouring plots to the sides of both neighbours.

4. If on one of the construction land plots the building to be constructed requires a greater width of the common wall than half of the wall, then this part of the wall shall be built within the boundaries of this plot.

5. During the construction of the foundation of a common wall, one of the neighbours may request the arrangement of such a foundation for the common wall as will be used by him for subsequent construction. The latter shall be obliged to reimburse the cost of the additional works for arranging the foundation.

6. When using the common wall/fence, the expenses to be borne shall be distributed between both neighbours in proportion to the respective share of the wall.

7. During the reconstruction of a building, on the basis of mutual agreement of the neighbours, it is possible to demolish the common wall/fence in compliance with legislation.

8. Each owner of a construction land plot has the right to reinforce the common wall/fence on his side in compliance with legislation.

9. It is also possible, on the boundary of a construction land plot, to pair agricultural structures with one (common) wall by agreement of the parties in those zones where the placement of agricultural structures is permitted.

10. If, when two neighbourhood walls are joined, one of the neighbours needs a greater deepening of the foundation for his building than the foundation of the existing wall, then, in compliance with legislation, he has the right to deepen the foundation of his wall to the level provided for by the design document, in such a way as not to cause damage thereby to the already existing wall.

11. If, during the deepening of the foundation, the wall or foundation of an existing building was damaged and it is established that this was caused by the ongoing construction, then the restoration and reinforcement of the damaged foundation wall shall be borne by the neighbour who carries out such construction.

Article 32. Placement of a fence within the boundaries of a land plot and determination of its maximum height🔗

1. Within the boundaries of a land plot, without agreement with the owner of the respective adjoining land plot, it is possible to place a fence whose height shall not exceed 2.2 metres.

2. Within the boundaries of a land plot, on the basis of mutual agreement of the owners of the respective adjoining land plots, it is possible to place a fence of a height exceeding 2.2 metres.

Article 33. Use of Neighbour's Construction Land Plot for Drainage of Atmospheric Precipitation and Connection to Main Engineering-Utility Networks🔗

1. The improvement of construction land plots shall be carried out in such a way that from this land plot:

a) water and atmospheric precipitation do not enter the neighbour's plot;

b) atmospheric precipitation that has entered the street or other public space shall not cause damage to the street or other public space and third parties.

2. The conditions specified in paragraph 1 of this Article do not apply to a ravine, gully, river and canal of common use.

3. When, due to the relief, it is impossible to carry out the measures specified in paragraph 1 of this Article, the neighbour shall be obliged to pass through his/her plot the atmospheric precipitation flowing down from the neighbour's plot.

4. When arranging a building roof on the boundary of a construction land plot, on the side of the neighbour's construction land plot, the customer/owner shall ensure the implementation of such engineering measures as will prevent atmospheric precipitation from entering the neighbour's land plot.

5. The owner of the adjacent land plot shall not have the right to obstruct the passing of the neighbour's engineering-utility networks through his/her own land plot for the purpose of connection to the main engineering-utility networks, if no other technical means exist for this.

6. The neighbour shall be informed in advance one month before the passing of engineering-utility networks through the adjacent land plot; in addition, the adjacent land plot shall permit the carrying out of such works (it shall not affect perennial plantings and existing buildings and structures). If annual crops have been sown, the said work shall be performed after harvesting or payment of compensation. Upon completion of the works, the area where the engineering-utility networks were laid shall be restored to its original condition.

7. The requirements defined by paragraph 4 of this Article shall also apply to the repair or reconstruction of an engineering-utility network already laid in the neighbour's land plot.

8. Engineering-utility networks laid in a land plot and intended for an adjacent land plot may not be considered an obstacle to carrying out construction on this land plot in the future. Before the start of construction on such a land plot, the network shall be relocated immediately upon request.